Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

被引:2
|
作者
Wang, Xu [1 ,2 ]
Zhao, Qiuhong [3 ,4 ]
Liu, Shixin [5 ]
Wang, Jia [6 ]
Qi, Liang [7 ]
机构
[1] Shenyang Univ Chem Technol, Sch Comp Sci & Technol, Shenyang, Peoples R China
[2] Hebei Univ Environm Engn, Sch Econ & Management, Qinhuangdao, Peoples R China
[3] Beihang Univ, Sch Econ & Management, Beijing, Peoples R China
[4] Beihang Univ, MoE Key Lab Complex Syst Anal & Management Decis, Beijing, Peoples R China
[5] Northeast Univ, Coll Informat Sci Engn, Shenyang, Peoples R China
[6] Shenyang Univ Technol, Sch Management, Shenyang, Peoples R China
[7] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao, Peoples R China
基金
中国国家自然科学基金;
关键词
Slab yard; integrated crane assignment and scheduling; improved column and cut generation method; robustness; ALLOCATION;
D O I
10.1080/00207543.2024.2388836
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.
引用
收藏
页码:1707 / 1724
页数:18
相关论文
共 50 条
  • [1] Integrated optimization of storage location assignment and crane scheduling in an unmanned slab yard
    Peng, Gongzhuang
    Wu, Youqi
    Zhang, Chunjiang
    Shen, Weiming
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161
  • [2] A Branch and Price Algorithm for Crane Assignment and Scheduling in Slab Yard
    Wang, Xu
    Zhou, MengChu
    Zhao, Qiuhong
    Liu, Shixin
    Guo, Xiwang
    Qi, Liang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (03) : 1122 - 1133
  • [3] Optimization of crane scheduling in slab yard based on cycle simulation
    Zhao, N., 1600, Systems Engineering Society of China (32):
  • [4] A Crane Guidance System with Scheduling Optimization Technology in a Steel Slab Yard
    Kuyama, Shuji
    Tomiyama, Shinji
    ISIJ INTERNATIONAL, 2016, 56 (05) : 820 - 827
  • [5] Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation
    Cao, Pengliang
    Jiang, Guiyan
    Zhao, Hongran
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING (ICCTE 2017), 2017, 135 : 568 - 573
  • [6] Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation
    Cao, Pengliang
    Zhao, Hongran
    Jiang, Guiyan
    2017 4TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS), 2017, : 595 - 599
  • [7] Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals
    Liu, Wenqian
    Zhu, Xiaoning
    Wang, Li
    Yan, Baicheng
    Zhang, Xuewei
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [8] Integrated optimization on yard crane scheduling and vehicle positioning at container yards
    Zhou, Chenhao
    Lee, Byung Kwon
    Li, Haobin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 138
  • [9] Scheduling optimization of yard crane for import containers based on truck batch arrival pattern
    Shao Q.-Q.
    Xu T.-T.
    Yang H.-Y.
    Jin Z.-H.
    Jin, Zhi-Hong (jinzhihong@dlmu.edu.cn), 1654, Northeast University (31): : 1654 - 1662
  • [10] THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK
    Ting, Shang Xiao
    Xin, Cao Jin
    Bin, Jia
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2271 - 2277