Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

被引:2
|
作者
Wang, Xu [1 ,2 ]
Zhao, Qiuhong [3 ,4 ]
Liu, Shixin [5 ]
Wang, Jia [6 ]
Qi, Liang [7 ]
机构
[1] Shenyang Univ Chem Technol, Sch Comp Sci & Technol, Shenyang, Peoples R China
[2] Hebei Univ Environm Engn, Sch Econ & Management, Qinhuangdao, Peoples R China
[3] Beihang Univ, Sch Econ & Management, Beijing, Peoples R China
[4] Beihang Univ, MoE Key Lab Complex Syst Anal & Management Decis, Beijing, Peoples R China
[5] Northeast Univ, Coll Informat Sci Engn, Shenyang, Peoples R China
[6] Shenyang Univ Technol, Sch Management, Shenyang, Peoples R China
[7] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao, Peoples R China
基金
中国国家自然科学基金;
关键词
Slab yard; integrated crane assignment and scheduling; improved column and cut generation method; robustness; ALLOCATION;
D O I
10.1080/00207543.2024.2388836
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.
引用
收藏
页码:1707 / 1724
页数:18
相关论文
共 50 条
  • [21] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [22] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [23] Yard Crane Scheduling with Real-time Reshuffle
    Man, Xiaoyi
    Zheng, Feifeng
    Chu, Feng
    Xu, Yinfeng
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 225 - 230
  • [24] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    Hsu, Hsien-Pin
    Chou, Chien-Chang
    Wang, Chia-Nan
    IEEE Access, 2022, 10
  • [25] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    HSU, HSIEN-PIN
    CHOU, CHIEN-CHANG
    WANG, CHIA-NAN
    IEEE ACCESS, 2022, 10 : 64650 - 64670
  • [26] Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem
    Wang, Kai
    Zhen, Lu
    Wang, Shuaian
    Laporte, Gilbert
    TRANSPORTATION SCIENCE, 2018, 52 (04) : 812 - 834
  • [27] A robust optimization approach to the integrated berth allocation and quay crane assignment problem
    Shang, Xiao Ting
    Cao, Jin Xin
    Ren, Jie
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 94 : 44 - 65
  • [28] Yard crane scheduling in container terminal using Genetic Algorithm
    Yang, Yang
    Gen, Mistuo
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 180 - 190
  • [29] On the Optimization of Yard Crane Scheduling in a Container Terminal Based on GATS
    Hu Yanhong
    Sun Junqing
    Han Mei
    Liu Fenglian
    Yang Peng
    Feng Meiling
    PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 5473 - 5477
  • [30] Solving the yard crane scheduling problem with dynamic assignment of input/output points
    Wang, Hongtao
    Villa, Fulgencia
    Vallada, Eva
    Ruiz, Ruben
    COMPUTERS & OPERATIONS RESEARCH, 2025, 173