Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

被引:2
|
作者
Wang, Xu [1 ,2 ]
Zhao, Qiuhong [3 ,4 ]
Liu, Shixin [5 ]
Wang, Jia [6 ]
Qi, Liang [7 ]
机构
[1] Shenyang Univ Chem Technol, Sch Comp Sci & Technol, Shenyang, Peoples R China
[2] Hebei Univ Environm Engn, Sch Econ & Management, Qinhuangdao, Peoples R China
[3] Beihang Univ, Sch Econ & Management, Beijing, Peoples R China
[4] Beihang Univ, MoE Key Lab Complex Syst Anal & Management Decis, Beijing, Peoples R China
[5] Northeast Univ, Coll Informat Sci Engn, Shenyang, Peoples R China
[6] Shenyang Univ Technol, Sch Management, Shenyang, Peoples R China
[7] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao, Peoples R China
基金
中国国家自然科学基金;
关键词
Slab yard; integrated crane assignment and scheduling; improved column and cut generation method; robustness; ALLOCATION;
D O I
10.1080/00207543.2024.2388836
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.
引用
收藏
页码:1707 / 1724
页数:18
相关论文
共 50 条
  • [31] Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
    Hsu, Hsien-Pin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Dang, Thanh-Tuan
    MATHEMATICS, 2021, 9 (18)
  • [32] Robust optimization for a class of ship traffic scheduling problem with uncertain arrival and departure times
    Zhang, Xinyu
    Li, Runfo
    Wang, Chengbo
    Xue, Biao
    Guo, Wenqiang
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [33] Two Yard Crane Scheduling With Dynamic Processing Time and Interference
    Zheng, Feifeng
    Man, Xiaoyi
    Chu, Feng
    Liu, Ming
    Chu, Chengbin
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2018, 19 (12) : 3775 - 3784
  • [34] Discrete time model and algorithms for container yard crane scheduling
    Li, Wenkai
    Wu, Yong
    Petering, M. E. H.
    Goh, Mark
    de Souza, Robert
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 198 (01) : 165 - 172
  • [35] Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals
    Guo, Liming
    Zheng, Jianfeng
    Du, Jian
    Gao, Ziyou
    Fagerholt, Kjetil
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 183
  • [36] Integrated quay crane and yard truck scheduling for unloading inbound containers
    Kaveshgar, Narges
    Nathan Huynh
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 : 168 - 177
  • [37] The integrated yard truck and yard crane scheduling problem: Blenders' decomposition-based methods
    Cao, Jin Xin
    Lee, Der-Horng
    Chen, Jiang Hang
    Shi, Qixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (03) : 344 - 353
  • [38] Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
    Lee, Der-Horng
    Jin, Jian Gang
    Chen, Jiang Hang
    TRANSPORTATION RESEARCH RECORD, 2011, (2222) : 63 - 71
  • [39] Multi-Objective Optimization of the Quay Crane Assignment and Scheduling Problem: Time and Movement Optimization
    de Oliveira, Jean Phelippe Ramos
    Barbosa, Juan David
    Lamprou, Maria
    2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [40] An accelerated Benders decomposition algorithm for the integrated storage space assignment, berth allocation, and yard crane deployment problem
    Soroushnia, Golsa
    Alinaghian, Mahdi
    Malekahmadi, Amirsalar
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194