Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

被引:2
|
作者
Wang, Xu [1 ,2 ]
Zhao, Qiuhong [3 ,4 ]
Liu, Shixin [5 ]
Wang, Jia [6 ]
Qi, Liang [7 ]
机构
[1] Shenyang Univ Chem Technol, Sch Comp Sci & Technol, Shenyang, Peoples R China
[2] Hebei Univ Environm Engn, Sch Econ & Management, Qinhuangdao, Peoples R China
[3] Beihang Univ, Sch Econ & Management, Beijing, Peoples R China
[4] Beihang Univ, MoE Key Lab Complex Syst Anal & Management Decis, Beijing, Peoples R China
[5] Northeast Univ, Coll Informat Sci Engn, Shenyang, Peoples R China
[6] Shenyang Univ Technol, Sch Management, Shenyang, Peoples R China
[7] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao, Peoples R China
基金
中国国家自然科学基金;
关键词
Slab yard; integrated crane assignment and scheduling; improved column and cut generation method; robustness; ALLOCATION;
D O I
10.1080/00207543.2024.2388836
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.
引用
收藏
页码:1707 / 1724
页数:18
相关论文
共 50 条
  • [11] Modeling and Solution of Crane Scheduling in Slab Yard of Steelmaking Plant
    Yang, Liying
    DanNiu
    Liu, Minghao
    Li, Qi
    Yang, Jun
    2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 5847 - 5852
  • [12] Research on optimization of multi stage yard crane scheduling based on genetic algorithm
    Dingyou Lei
    Peng Zhang
    Yinggui Zhang
    Yangkun Xia
    Shuo Zhao
    Journal of Ambient Intelligence and Humanized Computing, 2020, 11 : 483 - 494
  • [13] Robust Multistage Yard Crane Scheduling in Container Terminals
    Marx, Tobias
    Hartisch, Michael
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273
  • [14] Research on optimization of multi stage yard crane scheduling based on genetic algorithm
    Lei, Dingyou
    Zhang, Peng
    Zhang, Yinggui
    Xia, Yangkun
    Zhao, Shuo
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2020, 11 (02) : 483 - 494
  • [15] Optimization of yard crane scheduling, using particle swarm optimization with genetic algorithm operators (PSOGAO)
    Kumar, M. Manoj
    Omkar, S. N.
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2008, 67 (05): : 335 - 339
  • [16] Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem
    Dang Cong Hop
    Nguyen Van Hop
    Truong Tran Mai Anh
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 153
  • [17] Robust optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Miao, Lixin
    Zhang, Canrong
    Wu, Tao
    Liang, Zhe
    NAVAL RESEARCH LOGISTICS, 2024, 71 (03) : 452 - 476
  • [18] A hybrid parallel genetic algorithm for yard crane scheduling
    He, Junliang
    Chang, Daofang
    Mi, Weijian
    Yan, Wei
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (01) : 136 - 155
  • [19] Integrated simulation and optimisation of scheduling yard crane and yard truck in loading operation
    Cao, Pengliang
    Jiang, Guiyan
    Huang, Senjia
    Ma, Lingqi
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2020, 12 (03) : 230 - 250
  • [20] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470