Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation

被引:0
|
作者
Cao, Pengliang [1 ]
Zhao, Hongran [1 ]
Jiang, Guiyan [2 ]
机构
[1] Ningbo Univ, Fac Maritime & Transportat, Ningbo, Zhejiang, Peoples R China
[2] Ningbo Univ, Jiangsu Prov Collaborat Innovat Ctr Modern Urban, Natl Traff Management Engn & Technol, Res Ctr Ningbo Univ Subctr,Fac Maritime & Transp, Ningbo, Zhejiang, Peoples R China
关键词
Container terminal; Loading operation; Yard Crane; Yard Truck; Integrated scheduling; GENETIC ALGORITHM;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
To further decrease berthing time of container vessels, synchronous operation of Yard Cranes (YCs) and Yard Trucks (YTs) is mainly considered in multiple work lines condition. On this basis, an integrated scheduling optimization model of YC and YT, aiming at minimize the makespan of loading operation, is provided based on YT pool strategy with the consideration of practical constrains, such as the safe distance between YCs, task precedence and so on. Considering the complexity of mathematical model, the Genetic Algorithm (GA) is introduced to allocate workload for YCs, a routing method is used to find the shortest travelling paths for YCs and the First Come First Serve (FCFS) rule is adopted to schedule YTs among different work lines dynamically. In the end, the effectiveness of optimization model and algorithm is certified by making numerical experiments. The results show that using pool strategy is beneficial to short makespan of loading operation when YTs are relatively less.
引用
收藏
页码:595 / 599
页数:5
相关论文
共 50 条
  • [41] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Shell Ying Huang
    Ya Li
    Flexible Services and Manufacturing Journal, 2017, 29 : 689 - 720
  • [42] Research on optimization of multi stage yard crane scheduling based on genetic algorithm
    Lei, Dingyou
    Zhang, Peng
    Zhang, Yinggui
    Xia, Yangkun
    Zhao, Shuo
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2020, 11 (02) : 483 - 494
  • [43] Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals
    Liu, Wenqian
    Zhu, Xiaoning
    Wang, Li
    Yan, Baicheng
    Zhang, Xuewei
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [44] Scheduling of Yard Truck Considering Loading and Unloading Simultaneously in an Underground Container Logistics System
    Gao, Yinping
    Chang, Daofang
    Yuan, Jun
    Liang, Chengji
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (02) : 246 - 263
  • [45] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Huang, Shell Ying
    Li, Ya
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (3-4) : 689 - 720
  • [46] Robust Multistage Yard Crane Scheduling in Container Terminals
    Marx, Tobias
    Hartisch, Michael
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273
  • [47] A hybrid parallel genetic algorithm for yard crane scheduling
    He, Junliang
    Chang, Daofang
    Mi, Weijian
    Yan, Wei
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (01) : 136 - 155
  • [48] Yard Crane Scheduling for container storage, retrieval, and relocation
    Galle, Virgile
    Barnhart, Cynthia
    Jaillet, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 288 - 316
  • [49] AN ANT COLONY ALGORITHM FOR YARD TRUCK SCHEDULING AND YARD LOCATION ASSIGNMENT PROBLEMS WITH PRECEDENCE CONSTRAINTS
    Zhaojie XUE
    Canrong ZHANG
    Lixin MIAO
    Wei-Hua LIN
    Journal of Systems Science and Systems Engineering, 2013, 22 (01) : 21 - 37
  • [50] An ant colony algorithm for yard truck scheduling and yard location assignment problems with precedence constraints
    Zhaojie Xue
    Canrong Zhang
    Lixin Miao
    Wei-Hua Lin
    Journal of Systems Science and Systems Engineering, 2013, 22 : 21 - 37