Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China

被引:48
|
作者
Ji, Yingbo [1 ]
Qi, Lin [1 ]
Liu, Yan [1 ]
Liu, Xinnan [1 ]
Li, Hong Xian [2 ]
Li, Yan [2 ]
机构
[1] North China Univ Technol, Dept Civil Engn, Beijing 100043, Peoples R China
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
来源
APPLIED SCIENCES-BASEL | 2018年 / 8卷 / 11期
基金
国家重点研发计划;
关键词
construction delay; prefabricated construction; decision-making trial and evaluation laboratory (DEMATEL); analytic network process (ANP); multi-criteria decision making; ROAD CONSTRUCTION PROJECTS; HIERARCHY PROCESS AHP; SCHEDULE RISK; HONG-KONG; MANAGEMENT; COST; DEMATEL; PERSPECTIVE; OPPORTUNITY; SIMULATION;
D O I
10.3390/app8112324
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Prefabricated construction has been widely accepted as an alternative to conventional cast-in-situ construction, given its improved performance. However, prefabricated concrete building projects frequently encounter significant delays. It is, therefore, crucial to identify key factors affecting schedule and explore strategies to minimise the schedule delays for prefabricated concrete building projects. This paper adopts the decision-making trial and evaluation laboratory (DEMATEL) model and analytic network process (ANP) method to quantify the cause-and-effect relationships and prioritise the key delay factors in terms of their importance in the Chinese construction industry. The DEMATEL model evaluates the extent to which each factor impacts other factors. The quantified extents are then converted into a prioritisation matrix through ANP. The delay factors of prefabricated construction projects are selected and categorised based on a literature review and an expert interview. Questionnaires are then implemented to collect the data. The results reveal that the issue of inefficient structural connections for prefabricated components is found to be the most significant factor and most easily affected by other delay factors. This research also suggests prioritising major delay factors, such as lack of communication among participants' and low productivity', in the Chinese construction industry during scheduling control. Overall, this research contributes an assessment framework for decision making in the scheduling management of prefabricated construction.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Strength and Influencing Factors of Sleeve Grouting Materials in Prefabricated Building
    Xiong Y.
    Li J.
    Sun B.
    Mao S.
    Jianzhu Cailiao Xuebao/Journal of Building Materials, 2019, 22 (02): : 272 - 277
  • [42] Developing a system for assessing the sustainability in school building projects
    Alhilli, Hassan K.
    Burhan, Abbas M.
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2021, 23 (12) : 17483 - 17502
  • [43] Developing a system for assessing the sustainability in school building projects
    Hassan K. Alhilli
    Abbas M. Burhan
    Environment, Development and Sustainability, 2021, 23 : 17483 - 17502
  • [44] Delay factors of the schedule of strategic industrial projects
    Sweis, Rateb
    Moarefi, Alireza
    Hoseini-Amiri, Seyyed-Mahmoud
    Moarefi, Soad
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2019, 37 (01) : 69 - 86
  • [45] Current State-of-play in Identifying and Assessing Safety Risks at Design Stage of Building Projects in China
    Deng Tiejun
    Xie Guibin
    Zou, Patrick X. W.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1313 - 1327
  • [46] Synergetic Order Parameter Identification of Prefabricated Building Projects Based on Main Theme Analysis
    Yaning Qiao
    Xiaobo Shi
    Jia Ren
    Wanying Liu
    Fang Shen
    Jiayan Chen
    Alex Opoku
    Arabian Journal for Science and Engineering, 2022, 47 : 5109 - 5123
  • [47] Synergetic Order Parameter Identification of Prefabricated Building Projects Based on Main Theme Analysis
    Qiao, Yaning
    Shi, Xiaobo
    Ren, Jia
    Liu, Wanying
    Shen, Fang
    Chen, Jiayan
    Opoku, Alex
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (04) : 5109 - 5123
  • [48] Simulation Analysis of Supply Chain Resilience of Prefabricated Building Projects Based on System Dynamics
    Liu, Wei
    Liu, Zixuan
    BUILDINGS, 2023, 13 (10)
  • [49] Risk Network Evaluation of Prefabricated Building Projects in Underdeveloped Areas: A Case Study in Qinghai
    Wang, Qiuyu
    Gong, Zhiqi
    Liu, Chengkui
    SUSTAINABILITY, 2022, 14 (10)
  • [50] Building China: Five projects, five stories
    不详
    A + U-ARCHITECTURE AND URBANISM, 2008, (450): : 7 - 7