Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China

被引:47
|
作者
Ji, Yingbo [1 ]
Qi, Lin [1 ]
Liu, Yan [1 ]
Liu, Xinnan [1 ]
Li, Hong Xian [2 ]
Li, Yan [2 ]
机构
[1] North China Univ Technol, Dept Civil Engn, Beijing 100043, Peoples R China
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
来源
APPLIED SCIENCES-BASEL | 2018年 / 8卷 / 11期
基金
国家重点研发计划;
关键词
construction delay; prefabricated construction; decision-making trial and evaluation laboratory (DEMATEL); analytic network process (ANP); multi-criteria decision making; ROAD CONSTRUCTION PROJECTS; HIERARCHY PROCESS AHP; SCHEDULE RISK; HONG-KONG; MANAGEMENT; COST; DEMATEL; PERSPECTIVE; OPPORTUNITY; SIMULATION;
D O I
10.3390/app8112324
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Prefabricated construction has been widely accepted as an alternative to conventional cast-in-situ construction, given its improved performance. However, prefabricated concrete building projects frequently encounter significant delays. It is, therefore, crucial to identify key factors affecting schedule and explore strategies to minimise the schedule delays for prefabricated concrete building projects. This paper adopts the decision-making trial and evaluation laboratory (DEMATEL) model and analytic network process (ANP) method to quantify the cause-and-effect relationships and prioritise the key delay factors in terms of their importance in the Chinese construction industry. The DEMATEL model evaluates the extent to which each factor impacts other factors. The quantified extents are then converted into a prioritisation matrix through ANP. The delay factors of prefabricated construction projects are selected and categorised based on a literature review and an expert interview. Questionnaires are then implemented to collect the data. The results reveal that the issue of inefficient structural connections for prefabricated components is found to be the most significant factor and most easily affected by other delay factors. This research also suggests prioritising major delay factors, such as lack of communication among participants' and low productivity', in the Chinese construction industry during scheduling control. Overall, this research contributes an assessment framework for decision making in the scheduling management of prefabricated construction.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Assessing effects of afforestation projects in China
    Xiaohui Yang
    Zhiqing Jia
    Longjun Ci
    Nature, 2010, 466 : 315 - 315
  • [32] ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China
    Li, Dezhi
    Li, Xin
    Feng, Haibo
    Wang, Yan
    Fan, Shushu
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 977 - 992
  • [33] Evolution Game Analysis of Supply Chain Synergy Benefits of Prefabricated Building Projects
    Liu, Wei
    Han, Luyao
    APPLIED SCIENCES-BASEL, 2023, 13 (21):
  • [34] DISMANTLEABLE JOINTS WITH CONTROLLED PROPERTIES OF A PREFABRICATED REINFORCED CONCRETE BUILDING SYSTEM
    Witzany, Jiri
    Cejka, Tomas
    Zigler, Radek
    SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, : 485 - 488
  • [35] Study on Resource Management for Prefabricated Concrete Building Based on BIM Technology
    Xu Ning
    Wang Guangbin
    1ST INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING AND MATERIALS (ACEM1) AND 1ST WORLD SYMPOSIUM ON SUSTAINABLE BIO-COMPOSITE MATERIALS AND STRUCTURES (SBMS1), 2019, 275
  • [36] Research on safety risk assessment model of prefabricated concrete building construction
    Guo, Jianfei
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2022, 18 (03) : 197 - 210
  • [37] Cost Analysis and Economical Suitability of Prefabricated Concrete Structures in Building Construction
    Naz, Fatima
    Abro, Safeer Ahmed
    Memon, Nafees Ahmed
    Ahmed, Noman
    JURNAL KEJURUTERAAN, 2023, 35 (05): : 1135 - 1143
  • [38] Effect of connection methods on hygrothermal performance of prefabricated concrete building walls
    Guo, Xingguo
    Nie, Longhui
    Ji, Jiangjun
    Chen, Wenhua
    Li, Yong
    Liu, Xiangwei
    JOURNAL OF BUILDING ENGINEERING, 2024, 90
  • [39] Assessing the air pollution abatement effect of prefabricated buildings in China
    Li, Yilong
    Gao, Yue
    Meng, Xiangxu
    Liu, Xingle
    Feng, Yanchao
    ENVIRONMENTAL RESEARCH, 2023, 239
  • [40] Decarbonizing prefabricated building waste: Scenario simulation of policies in China
    Zhao, Wenbo
    Hao, Jian Li
    Gong, Guobin
    Ma, Wenting
    Zuo, Jian
    Di Sarno, Luigi
    JOURNAL OF CLEANER PRODUCTION, 2024, 458