Railway track maintenance using the stoneblower

被引:0
|
作者
Fair, PI [1 ]
Anderson, WF [1 ]
机构
[1] Univ Sheffield, Dept Civil & Struct Engn, Sheffield S10 2TN, S Yorkshire, England
关键词
maintenance & inspection; railway systems;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The search for an improved mechanised method of maintaining railway track to the correct level and alignment led to the development of the Stoneblower, a machine that lifts the rail and attached sleepers and pneumatically injects the required amount of 20 mm stone into the void created. This minimises disturbance to the existing well-compacted ballast. By 1999 a fleet of Stoneblowers; was fully operational across the UK rail network and achieving target rates of track maintenance. This paper compares the track-quality data recorded before, during and after Stoneblower maintenance and confirms the potential of the Stoneblower. Detailed analysis of the data has given a better understanding of the performance, and has provided guidance for optimising the deployment of the Stoneblowers and the stoneblowing procedures.
引用
收藏
页码:155 / 167
页数:13
相关论文
共 50 条
  • [21] Network-Level Railway Track Maintenance Management Model
    Burrow, M. P. N.
    Naito, S.
    Evdorides, H. T.
    TRANSPORTATION RESEARCH RECORD, 2009, (2117) : 66 - 76
  • [22] Modelling the railway track infrastructure variability for maintenance operations optimization
    Rhayma, N.
    Bressolette, Ph.
    Breul, P.
    Costa D'Aguiar, S.
    Civil-Comp Proceedings, 2012, 98
  • [23] Optimisation of railway track maintenance and renewal works by genetic algorithms
    Guler, Hakan
    GRADEVINAR, 2016, 68 (12): : 979 - 993
  • [24] A parallel method for assessing track segment quality in railway maintenance
    Guo, Jianfeng
    Liu, Jinzhao
    Tian, Xinyu
    Yang, Jinsong
    Zhang, Yu
    Tao, Kai
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2025,
  • [25] Investigation on railway track maintenance in sandy-dry areas
    Zakeri, Jabbar Ali
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (02) : 135 - 140
  • [26] OPTIMIZING RAILWAY TRACK MAINTENANCE SCHEDULING TO MINIMIZE CIRCULATION IMPACTS
    Bueno, Paulo M. S.
    Vilela, Plinio R. S.
    Christofoletti, Luciano M.
    Vieira, Anderson P.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2019, 2019,
  • [27] A taxonomy of human communication errors and application to railway track maintenance
    Gibson W.H.
    Megaw E.D.
    Young M.S.
    Lowe E.
    Cognition, Technology & Work, 2006, 8 (1) : 57 - 66
  • [28] Optimal prognostic maintenance policy for railway track systems using rolling contact fatigue data
    Dinmohammadi, F.
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 957 - 963
  • [29] Development of Risk-based Railway Track Maintenance Method Using Image Analysis Technology
    Shimizu A.
    Miwa M.
    Quarterly Report of RTRI (Railway Technical Research Institute), 2019, 60 (04) : 262 - 267
  • [30] Railway track inspection using GPR
    Hugenschmidt, J
    JOURNAL OF APPLIED GEOPHYSICS, 2000, 43 (2-4) : 147 - 155