Railway track maintenance using the stoneblower

被引:0
|
作者
Fair, PI [1 ]
Anderson, WF [1 ]
机构
[1] Univ Sheffield, Dept Civil & Struct Engn, Sheffield S10 2TN, S Yorkshire, England
关键词
maintenance & inspection; railway systems;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The search for an improved mechanised method of maintaining railway track to the correct level and alignment led to the development of the Stoneblower, a machine that lifts the rail and attached sleepers and pneumatically injects the required amount of 20 mm stone into the void created. This minimises disturbance to the existing well-compacted ballast. By 1999 a fleet of Stoneblowers; was fully operational across the UK rail network and achieving target rates of track maintenance. This paper compares the track-quality data recorded before, during and after Stoneblower maintenance and confirms the potential of the Stoneblower. Detailed analysis of the data has given a better understanding of the performance, and has provided guidance for optimising the deployment of the Stoneblowers and the stoneblowing procedures.
引用
收藏
页码:155 / 167
页数:13
相关论文
共 50 条
  • [1] A stochastic railway track maintenance model
    Prescott, D. R.
    Andrews, J. D.
    De Rozieres, F.
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 873 - 879
  • [2] Stoneblower provides ballast maintenance solution
    Railw Gaz Int, 9 (595-596):
  • [3] Optimal Scheduling of Track Maintenance on a Railway Network
    Zhang, Tao
    Andrews, John
    Wang, Rui
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (02) : 285 - 297
  • [4] A heuristic approach to railway track maintenance scheduling
    Quiroga, L. M.
    Schnieder, E.
    COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS, 2010, 114 : 687 - 699
  • [5] New Equipment for Railway Track Maintenance.
    Wenty, Rainer
    Steinboeck, Nikolaus
    Zeitschrift fuer Eisenbahnwesen und Verkehrstechnik - Glasers Annalen, 1986, 108 (06): : 155 - 160
  • [6] Minimising costs in scheduling railway track maintenance
    Lake, M
    Ferreira, L
    Murray, M
    COMPUTERS IN RAILWAYS VII, 2000, 7 : 895 - 902
  • [7] Scheduling of railway track maintenance activities and crews
    Higgins, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (10) : 1026 - 1033
  • [8] Cost Effective Predictive Railway Track Maintenance
    Harikrishnan, Sri
    Dorner, Verena
    Sohi, Shahrom
    GOOD PRACTICES AND NEW PERSPECTIVES IN INFORMATION SYSTEMS AND TECHNOLOGIES, VOL 6, WORLDCIST 2024, 2024, 990 : 35 - 44
  • [9] Track shifting technology for track maintenance of high-speed railway
    Xu, Lingyan
    Yuan, Wei
    Xie, Jian
    Xie, Haoran
    Zang, Chuanzhen
    Yue, Tong
    Journal of Railway Science and Engineering, 2024, 21 (07) : 2557 - 2568
  • [10] Reliability analysis and maintenance decision for railway sleepers using track condition information
    Zhao, J.
    Chan, A. H. C.
    Burrow, M. P. N.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (08) : 1047 - 1055