Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off

被引:63
|
作者
Xiong, Ying [1 ]
Kuang, Yaping [2 ,3 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
[2] Zhejiang Univ, Sch Civil Engn & Architecture, Hangzhou 310027, Peoples R China
[3] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Algorithms; Cost control; Optimization; Project management; Time factors;
D O I
10.1061/(ASCE)0733-9364(2008)134:2(153)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a combinatorial optimization problem. This technical note employed an evolutionary algorithm-ant colony optimization (ACO) algorithm to deal with the time-cost trade-off problems. Combining with the modified adaptive weight approach, the ACO algorithm can find out the optimal solutions, and define the Pareto front as well. The development of the ACO-based multiobjective approach in this technical note provides an attractive alternative to solving construction time-cost optimization.
引用
收藏
页码:153 / 156
页数:4
相关论文
共 50 条
  • [41] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [42] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [43] A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System
    Tavassoli, Leyla Sadat
    Massah, Reza
    Montazeri, Arsalan
    Mirmozaffari, Mirpouya
    Jiang, Guang-Jun
    Chen, Hong-Xia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [44] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [45] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 375 - 376
  • [46] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375
  • [48] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [49] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [50] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Jl Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2005, 4 (03) : 18 - 23