Uncertain Random Dependent-Chance Programming for Flow-Shop Scheduling Problem

被引:0
|
作者
Touil, Achraf [1 ]
Echchatbi, Abdelwahed [1 ]
机构
[1] Hassan 1st Univ, Lab Engn Ind Management & Innovat, Fac Sci & Technol, POB 577, Settat, Morocco
关键词
Permutation Flow Shop Problem (PFSP); Total Wasted Energy Consumption (TWEC); Uncertainty Random Theory (URT); Eagle Strategy (ES); Grey-Wolf Optimizer (GWO); Variable Neighbourhood Search (VNS); SEARCH; MODEL;
D O I
10.1109/fuzz48607.2020.9177703
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a type of uncertain random programming model based on the chance measure for the permutation flow shop (PFSP) scheduling problem is proposed with uncertain random job's processing times, i.e., dependent chance programming model (DCPM). The objective is to minimize the total wasted energy consumption induced by the machine idling. Moreover, to solve the proposed model, the uncertain random simulation and a two-stage eagle strategy (ES) are integrated to produce a hybrid intelligent algorithm. In the first stage of ES, the so-called Levy Flights is employed as the global search algorithm. While in the second stage, the grey-wolf optimizer (GWO) is used as the local search algorithm. The generated hybridization ensures the proper balance between exploration and exploitation. Besides, the Variable Neighborhood Search (VNS) is adopted as local search methods to improve the performance of the highlighted algorithm. The numerical results are reported to demonstrate the applicability of the proposed model.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Sevast'yanov's algorithm for the flow-shop scheduling problem
    Sch. Operations Res. Indust. Eng., Cornell University, Ithaca, NY 14853, United States
    不详
    Eur J Oper Res, 1 (176-189):
  • [42] Inverse scheduling: two-machine flow-shop problem
    Brucker, Peter
    Shakhlevich, Natalia V.
    JOURNAL OF SCHEDULING, 2011, 14 (03) : 239 - 256
  • [43] On a Flow-Shop Scheduling Problem with Fuzzy Pentagonal Processing Time
    Alharbi, Majed G.
    El-Wahed Khalifa, Hamiden Abd
    JOURNAL OF MATHEMATICS, 2021, 2021
  • [44] An Estimation of Distribution Algorithm for Permutation Flow-Shop Scheduling Problem
    Lemtenneche, Sami
    Bensayah, Abdallah
    Cheriet, Abdelhakim
    SYSTEMS, 2023, 11 (08):
  • [45] A Distributed Approach to Solving Hybrid Flow-shop Scheduling Problem
    Zou Feng-xing
    Zeng Ling-li
    Gao Zheng
    Liu Feng
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2457 - 2461
  • [46] A flow-shop problem formulation of biomass handling operations scheduling
    Bochtis, D. D.
    Dogoulis, P.
    Busato, P.
    Sorensen, C. G.
    Berruto, R.
    Gemtos, T.
    COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2013, 91 : 49 - 56
  • [47] Chance-constrained model for uncertain job shop scheduling problem
    Shen, Jiayu
    Zhu, Yuanguo
    SOFT COMPUTING, 2016, 20 (06) : 2383 - 2391
  • [48] Chance-constrained model for uncertain job shop scheduling problem
    Jiayu Shen
    Yuanguo Zhu
    Soft Computing, 2016, 20 : 2383 - 2391
  • [49] HEURISTICS IN FLOW-SHOP SCHEDULING WITH SEQUENCE DEPENDENT SETUP TIMES
    SIMONS, JV
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (02): : 215 - 225
  • [50] Dependent-chance integer programming applied to capital budgeting
    Iwamura, K
    Liu, BD
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1999, 42 (02) : 117 - 127