Uncertain Random Dependent-Chance Programming for Flow-Shop Scheduling Problem

被引:0
|
作者
Touil, Achraf [1 ]
Echchatbi, Abdelwahed [1 ]
机构
[1] Hassan 1st Univ, Lab Engn Ind Management & Innovat, Fac Sci & Technol, POB 577, Settat, Morocco
关键词
Permutation Flow Shop Problem (PFSP); Total Wasted Energy Consumption (TWEC); Uncertainty Random Theory (URT); Eagle Strategy (ES); Grey-Wolf Optimizer (GWO); Variable Neighbourhood Search (VNS); SEARCH; MODEL;
D O I
10.1109/fuzz48607.2020.9177703
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a type of uncertain random programming model based on the chance measure for the permutation flow shop (PFSP) scheduling problem is proposed with uncertain random job's processing times, i.e., dependent chance programming model (DCPM). The objective is to minimize the total wasted energy consumption induced by the machine idling. Moreover, to solve the proposed model, the uncertain random simulation and a two-stage eagle strategy (ES) are integrated to produce a hybrid intelligent algorithm. In the first stage of ES, the so-called Levy Flights is employed as the global search algorithm. While in the second stage, the grey-wolf optimizer (GWO) is used as the local search algorithm. The generated hybridization ensures the proper balance between exploration and exploitation. Besides, the Variable Neighborhood Search (VNS) is adopted as local search methods to improve the performance of the highlighted algorithm. The numerical results are reported to demonstrate the applicability of the proposed model.
引用
收藏
页数:8
相关论文
共 50 条
  • [21] Scheduling a flow-shop problem with fuzzy processing time
    Huang, Chieh-Hung
    Lin, Feng-Tse
    ICIC Express Letters, 2015, 9 (02): : 517 - 524
  • [22] AN EXTENSION OF PALMER HEURISTIC FOR THE FLOW-SHOP SCHEDULING PROBLEM
    HUNDAL, TS
    RAJGOPAL, J
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) : 1119 - 1124
  • [23] Fuzzy dependent-chance bilevel programming with application to resource allocation problem
    Gao, JW
    Liu, BD
    FUZZ-IEEE 2005: PROCEEDINGS OF THE IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS: BIGGEST LITTLE CONFERENCE IN THE WORLD, 2005, : 541 - 545
  • [25] Study on re-entrant flow-shop scheduling problem (optimization by mixed integer programming)
    Hino, R. (hino@mech.nagoya-u.ac.jp), 1600, Japan Society of Mechanical Engineers (79):
  • [26] Modeling and solution for hybrid flow-shop scheduling problem by two-stage stochastic programming
    Huang, Yiping
    Deng, Libao
    Wang, Jianlei
    Qiu, Weiwei
    Liu, Jinfeng
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233
  • [27] Dependent-chance programming: A class of stochastic optimization
    Liu, BD
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 1997, 34 (12) : 89 - 104
  • [28] Constraint Programming for the Robust Two-Machine Flow-Shop Scheduling Problem with Budgeted Uncertainty
    Juvin, Carla
    Houssin, Laurent
    Lopez, Pierre
    INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, CPAIOR 2023, 2023, 13884 : 354 - 369
  • [29] A genetic programming hyper-heuristic for the distributed assembly permutation flow-shop scheduling problem with sequence dependent setup times
    Song, Hong-Bo
    Lin, Jian
    SWARM AND EVOLUTIONARY COMPUTATION, 2021, 60
  • [30] Hybrid dependent-chance programming model for facility location-allocation problem
    Ni, Qingwen
    Li, Xiang
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 546 - 551