Uncertain Random Dependent-Chance Programming for Flow-Shop Scheduling Problem

被引:0
|
作者
Touil, Achraf [1 ]
Echchatbi, Abdelwahed [1 ]
机构
[1] Hassan 1st Univ, Lab Engn Ind Management & Innovat, Fac Sci & Technol, POB 577, Settat, Morocco
关键词
Permutation Flow Shop Problem (PFSP); Total Wasted Energy Consumption (TWEC); Uncertainty Random Theory (URT); Eagle Strategy (ES); Grey-Wolf Optimizer (GWO); Variable Neighbourhood Search (VNS); SEARCH; MODEL;
D O I
10.1109/fuzz48607.2020.9177703
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a type of uncertain random programming model based on the chance measure for the permutation flow shop (PFSP) scheduling problem is proposed with uncertain random job's processing times, i.e., dependent chance programming model (DCPM). The objective is to minimize the total wasted energy consumption induced by the machine idling. Moreover, to solve the proposed model, the uncertain random simulation and a two-stage eagle strategy (ES) are integrated to produce a hybrid intelligent algorithm. In the first stage of ES, the so-called Levy Flights is employed as the global search algorithm. While in the second stage, the grey-wolf optimizer (GWO) is used as the local search algorithm. The generated hybridization ensures the proper balance between exploration and exploitation. Besides, the Variable Neighborhood Search (VNS) is adopted as local search methods to improve the performance of the highlighted algorithm. The numerical results are reported to demonstrate the applicability of the proposed model.
引用
收藏
页数:8
相关论文
共 50 条
  • [31] Dependent-chance programming for fuzzy quadratic mi nimum spanning tree problem
    Gao, Jinwu
    Lu, Mei
    Proceedings of the Third International Conference on Information and Management Sciences, 2004, 3 : 273 - 278
  • [32] Cyclic hybrid flow-shop scheduling problem with machine setups
    Bozejko, Wojciech
    Gniewkowski, Lukasz
    Pempera, Jaroslaw
    Wodecki, Mieczyslaw
    2014 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE, 2014, 29 : 2127 - 2136
  • [34] Sevast'yanov's algorithm for the flow-shop scheduling problem
    Lourenco, HR
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (01) : 176 - 189
  • [35] A Reinforcement Learning Method for a Hybrid Flow-Shop Scheduling Problem
    Han, Wei
    Guo, Fang
    Su, Xichao
    ALGORITHMS, 2019, 12 (11)
  • [36] A GREEDY ALGORITHM FOR MULTIOBJECTIVE FUZZY FLOW-SHOP SCHEDULING PROBLEM
    Engin, Orhan
    Yilmaz, M. Kerim
    Akkoyunlu, M. Cabir
    Baysal, M. Emin
    Sarucan, Ahmet
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 189 - 194
  • [37] Inverse scheduling: two-machine flow-shop problem
    Peter Brucker
    Natalia V. Shakhlevich
    Journal of Scheduling, 2011, 14 : 239 - 256
  • [38] A discrete Jaya algorithm for permutation flow-shop scheduling problem
    Mishra, Aseem K.
    Pandey, Divya
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020, 11 (03) : 415 - 428
  • [39] Hybrid Flow-Shop Scheduling Problem Based on Genetic Algorithm
    Rong, Zhang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, MACHINERY AND ENERGY ENGINEERING (MSMEE 2017), 2017, 123 : 1703 - 1706
  • [40] Hybrid Flow-shop Scheduling Problem Based on Saving Energy
    Liu Xiang
    Zou Fengxing
    Zhang Xiangping
    Gao Zheng
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 7, 2008, : 48 - 53