New Approach to Appraisal of Rail Freight Projects in South Korea

被引:6
|
作者
Kang, Kyungwoo [1 ]
Strauss-Wieder, Anne [2 ]
Eom, Jin Ki [3 ]
机构
[1] Hanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
[2] A Strauss Wieder Inc, Westfield, NJ 07079 USA
[3] S Korea Railroad Res Inst, Railway Transport & Logist Res Dept, Uiwang 437757, Kyonggi, South Korea
关键词
D O I
10.3141/2159-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper contributes to the estimation of the value of rail freight transit time savings, reliability, and service frequency for producers and transport operators by using stated preference data for short-haul rail freight shipments in South Korea. To appraise investments in freight projects in South Korea, the mixed logit model was used to determine the value of rail freight transit time savings, resulting in an estimated savings of about $2.31/h per shipment. The value of rail freight reliability (the percentage of on-time arrivals and departures) is $2.78/h of delay and $0.54/day for scheduled freight service delay. The results for freight time value for different economic agents are surprising: shippers perceived the value of transit time, transit time reliability, and service frequency to be far higher than producers did. Shippers valued rail freight transit time savings at about $235/metric ton h, whereas this same value for producers was $1.21/metric ton h. When the time benefit based on these values was added to the preliminary feasibility evaluation for 20 freight railroad infrastructure projects in South Korea, the number of projects for which benefits outweighed costs increased from four to 11.
引用
收藏
页码:52 / 58
页数:7
相关论文
共 50 条
  • [41] Infrastructure asset management system for bridge projects in South Korea
    Taehoon Hong
    Myung Jin Chae
    Duyon Kim
    Choongwan Koo
    Kyo Sun Lee
    Kyoung Ho Chin
    KSCE Journal of Civil Engineering, 2013, 17 : 1551 - 1561
  • [42] A decomposition approach for integrated locomotive scheduling and driver assignment in rail freight transport
    Baermann, Andreas
    Martin, Alexander
    Staszek, Jonasz
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2024, 13
  • [43] Infrastructure asset management system for bridge projects in South Korea
    Hong, Taehoon
    Chae, Myung Jin
    Kim, Duyon
    Koo, Choongwan
    Lee, Kyo Sun
    Chin, Kyoung Ho
    KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (07) : 1551 - 1561
  • [45] A TWO-LEVEL APPROACH TO THE PROBLEM OF RAIL FREIGHT CAR FLEET COMPOSITION
    Bojovic, Nebojsa
    Boskovic, Branislav
    Milenkovic, Milos
    Sunjic, Aleksandar
    TRANSPORT, 2010, 25 (02) : 186 - 192
  • [46] Busan-Gimhae Light Rail Transit Bridge in South Korea
    Han, Sung-Gil
    Kim, Dong-Kwon
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 53 - 56
  • [47] Risk analysis and high speed rail projects in France: introducing economic slowdown into appraisal methodologies
    Limon, Thibaut
    Crozet, Yves
    WORLD CONFERENCE ON TRANSPORT RESEARCH - WCTR 2016, 2017, 25 : 2828 - 2846
  • [48] APPRAISAL OF INDUSTRIAL PROJECTS IN A DEVELOPING-COUNTRY - A QUANTITATIVE APPROACH
    TANG, JCS
    ADULBHAN, P
    YEAP, KT
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1980, 8 (03): : 388 - 392
  • [49] A NEW APPROACH TO EXECUTIVE APPRAISAL
    MACHAVER, WV
    ERICKSON, WE
    PERSONNEL, 1958, 35 (01) : 8 - 14
  • [50] A Rapid Supply Chain Appraisal Approach for Agribusiness Development Projects
    Collins, R. J.
    Dunne, A. J.
    PROCEEDINGS OF THE SECOND INTERNATIONAL SYMPOSIUM ON IMPROVING THE PERFORMANCE OF SUPPLY CHAINS IN THE TRANSITIONAL ECONOMIES, 2008, (794): : 73 - 79