New Approach to Appraisal of Rail Freight Projects in South Korea
被引:6
|
作者:
Kang, Kyungwoo
论文数: 0引用数: 0
h-index: 0
机构:
Hanyang Univ, Dept Transportat Engn, Ansan 425791, South KoreaHanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
Kang, Kyungwoo
[1
]
Strauss-Wieder, Anne
论文数: 0引用数: 0
h-index: 0
机构:
A Strauss Wieder Inc, Westfield, NJ 07079 USAHanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
Strauss-Wieder, Anne
[2
]
Eom, Jin Ki
论文数: 0引用数: 0
h-index: 0
机构:
S Korea Railroad Res Inst, Railway Transport & Logist Res Dept, Uiwang 437757, Kyonggi, South KoreaHanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
Eom, Jin Ki
[3
]
机构:
[1] Hanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
[2] A Strauss Wieder Inc, Westfield, NJ 07079 USA
[3] S Korea Railroad Res Inst, Railway Transport & Logist Res Dept, Uiwang 437757, Kyonggi, South Korea
This paper contributes to the estimation of the value of rail freight transit time savings, reliability, and service frequency for producers and transport operators by using stated preference data for short-haul rail freight shipments in South Korea. To appraise investments in freight projects in South Korea, the mixed logit model was used to determine the value of rail freight transit time savings, resulting in an estimated savings of about $2.31/h per shipment. The value of rail freight reliability (the percentage of on-time arrivals and departures) is $2.78/h of delay and $0.54/day for scheduled freight service delay. The results for freight time value for different economic agents are surprising: shippers perceived the value of transit time, transit time reliability, and service frequency to be far higher than producers did. Shippers valued rail freight transit time savings at about $235/metric ton h, whereas this same value for producers was $1.21/metric ton h. When the time benefit based on these values was added to the preliminary feasibility evaluation for 20 freight railroad infrastructure projects in South Korea, the number of projects for which benefits outweighed costs increased from four to 11.
机构:
Univ Stellenbosch, Dept Logist, Stellenbosch, South Africa
Private Bag X1, ZA-7602 Matieland, South AfricaUniv Stellenbosch, Dept Logist, Stellenbosch, South Africa
Havenga, Jan H.
Simpson, Zane P.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Stellenbosch, Dept Logist, Stellenbosch, South AfricaUniv Stellenbosch, Dept Logist, Stellenbosch, South Africa
Simpson, Zane P.
de Bod, Anneke
论文数: 0引用数: 0
h-index: 0
机构:
Univ Stellenbosch, Dept Logist, Stellenbosch, South AfricaUniv Stellenbosch, Dept Logist, Stellenbosch, South Africa
机构:
Stellenbosch Univ, Dept Ind Engn, Private Bag X1, ZA-7602 Stellenbosch, South AfricaStellenbosch Univ, Dept Ind Engn, Private Bag X1, ZA-7602 Stellenbosch, South Africa
Mulke, F. J.
Havenga, J. H.
论文数: 0引用数: 0
h-index: 0
机构:
Stellenbosch Univ, Dept Ind Engn, Private Bag X1, ZA-7602 Stellenbosch, South AfricaStellenbosch Univ, Dept Ind Engn, Private Bag X1, ZA-7602 Stellenbosch, South Africa