New Approach to Appraisal of Rail Freight Projects in South Korea

被引:6
|
作者
Kang, Kyungwoo [1 ]
Strauss-Wieder, Anne [2 ]
Eom, Jin Ki [3 ]
机构
[1] Hanyang Univ, Dept Transportat Engn, Ansan 425791, South Korea
[2] A Strauss Wieder Inc, Westfield, NJ 07079 USA
[3] S Korea Railroad Res Inst, Railway Transport & Logist Res Dept, Uiwang 437757, Kyonggi, South Korea
关键词
D O I
10.3141/2159-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper contributes to the estimation of the value of rail freight transit time savings, reliability, and service frequency for producers and transport operators by using stated preference data for short-haul rail freight shipments in South Korea. To appraise investments in freight projects in South Korea, the mixed logit model was used to determine the value of rail freight transit time savings, resulting in an estimated savings of about $2.31/h per shipment. The value of rail freight reliability (the percentage of on-time arrivals and departures) is $2.78/h of delay and $0.54/day for scheduled freight service delay. The results for freight time value for different economic agents are surprising: shippers perceived the value of transit time, transit time reliability, and service frequency to be far higher than producers did. Shippers valued rail freight transit time savings at about $235/metric ton h, whereas this same value for producers was $1.21/metric ton h. When the time benefit based on these values was added to the preliminary feasibility evaluation for 20 freight railroad infrastructure projects in South Korea, the number of projects for which benefits outweighed costs increased from four to 11.
引用
收藏
页码:52 / 58
页数:7
相关论文
共 50 条
  • [31] Towards a systems engineering approach to turnkey rail projects
    Cory, N
    Schmid, F
    INTERNATIONAL CONFERENCE ON RAILWAY AS A SYSTEM: WORKING ACROSS TRADITIONAL BOUNDARIES, 1999, 1999 (03): : 19 - 38
  • [32] The impacts of rail freight rate changes on regional economies, modal shift, and environmental quality in Korea
    Lee, HyunKyung
    Kim, HongBae
    INTERNATIONAL JOURNAL OF URBAN SCIENCES, 2018, 22 (04) : 517 - 528
  • [33] Time value of goods movement for project appraisal in South Korea
    Choi, Chang-Ho
    Park, Dongjoo
    Najafi, Fazil T.
    Kim, Jin-Lee
    TRANSPORTATION RESEARCH RECORD, 2007, (1996) : 92 - 99
  • [34] A new approach to social inequality: inequality of income and wealth in South Korea
    Shin, Kwang-Yeong
    JOURNAL OF CHINESE SOCIOLOGY, 2020, 7 (01):
  • [35] A new approach to social inequality: inequality of income and wealth in South Korea
    Kwang-Yeong Shin
    The Journal of Chinese Sociology, 7
  • [36] Financial, legal and organizational structures adapted to the new challenges of rail freight
    de, Smet, P.M.
    Rail International, 1996, (2-3): : 58 - 63
  • [37] CAPRES network capacity assessment for Swiss North-South rail freight traffic
    Lucchini, L
    Rivier, R
    Emery, D
    COMPUTERS IN RAILWAYS VII, 2000, 7 : 221 - 230
  • [38] Risk Factors in Dedicated Freight Corridor and Mass Rapid-Transit Metro Rail Infrastructure Projects
    Singh, Simranjeet
    Johari, Sparsh
    Hasan, Abid
    Jha, Kumar Neeraj
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (02)
  • [39] New Rail Line for South Africa
    Glickenstein, Harvey
    IEEE VEHICULAR TECHNOLOGY MAGAZINE, 2007, 2 (01): : 43 - 48
  • [40] Transit: New Los Angeles rail projects are possible
    Anon
    ENR (Engineering News-Record), 2001, 247 (02):