Contractual Guidelines for Promoting Integrated Project Delivery

被引:19
|
作者
Ahmed, Muaz O. [1 ]
Nabi, Mohamad Abdul [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
Caranci, Dustin [1 ]
Eberle, Jackson [1 ]
Hawkins, Zachary [1 ]
Sparrow, Ross [1 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
关键词
Integrated project delivery (IPD); Project delivery methods; Contractual guidelines; Construction claims; Construction disputes; Construction management;
D O I
10.1061/(ASCE)CO.1943-7862.0002173
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) was originally developed to overcome the challenges associated with increased project complexity, high fragmentation levels of the construction industry, and inadequate interoperability among the different stakeholders. Despite its documented benefits on project performance, IPD adoption is still witnessing a slow uptake in the US. Recent research studies have tied such slow adoption-in part-to the lack of contractual understanding and implementation of IPD. This paper addresses this critical research need. To this end, the authors used an interdependent research methodology consisting of (1) selection of IPD agreements; (2) identification of the main contractual IPD issues of concern that may lead to conflicts, claims, and/or disputes between the contracting parties through analysis of seven various IPD case study projects; and (3) reviewing and analyzing the contractual provisions, relevant to the identified IPD issues of concern, under the most pertinent national IPD standard forms of contracts. It is worth noting that in order to assure the scientific rigor of this research, the authors consulted throughout all methodological steps and verified research outcomes with the construction group of a leading legal firm. Results show that the major areas of concern in relation to contractual management of IPD processes include risks and incentives; liabilities and indemnification; suspension and termination; insurance; data sharing; and, dispute resolution. This study contributes to the body of knowledge by providing (1) a comparative analysis showing how these issues have been tackled under leading IPD standard forms of contracts; and (2) contractual guidelines to promote better understanding of effective and efficient IPD practices. As such, this research offers substantial practical implications through furnishing insightful information about causes of disputes in IPD agreements as well as how the most popular IPD contracts in the US handle them, and finally, checklist questions to serve as a reference for the contracting parties in negotiating the terms governing their IPD projects. Ultimately, this research should better support changing the contracting culture to better enable and facilitate broader and wider adoption of IPD practices in the US.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Benchmark Performance Metrics for Integrated Project Delivery
    Hanna, Awad S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (09)
  • [32] Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery
    Zhang, Lianying
    He, Jing
    Zhou, Shuguo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (07) : 795 - 804
  • [33] CONTRACTUAL PSYCHOTHERAPY - GUIDELINES AND STRATEGIES FOR CHANGE
    MONTGOMERY, AG
    MONTGOMERY, DJ
    PSYCHOTHERAPY-THEORY RESEARCH AND PRACTICE, 1975, 12 (04): : 348 - 352
  • [34] Comparison of Quebec's Project Delivery Methods: Relational Contract Law and Differences in Contractual Language
    Jobidon, Gabriel
    Lemieux, Pierre
    Beauregard, Robert
    LAWS, 2019, 8 (02)
  • [35] Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality
    Agbaxode, Peter Dodzi Kwasi
    Saghatforoush, Ehsan
    Dlamini, Sitsabo
    Korsah, John Kwesi
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (06) : 817 - 834
  • [36] A Review and Classification of Integrated Project Delivery Implementation Enablers
    Kahvandi, Zahra
    Saghatforoush, Ehsan
    ZareRavasan, Ahad
    Viana, Marina Lapa
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2020, 25 (02) : 219 - 236
  • [37] Risk/Reward Compensation Model for Integrated Project Delivery
    Zhang, Lianying
    Li, Fei
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2014, 25 (05): : 558 - 567
  • [38] Integrated project delivery with blockchain: An automated financial system
    Elghaish, Faris
    Abrishami, Sepehr
    Hosseini, M. Reza
    AUTOMATION IN CONSTRUCTION, 2020, 114
  • [39] Exploring the Barriers to Implementing the Integrated Project Delivery Method
    S. Buk'hail R.
    Al-Sabah R.S.
    Journal of King Saud University - Engineering Sciences, 2024, 36 (08) : 543 - 551
  • [40] Compensation Structure and Contingency Allocation in Integrated Project Delivery
    Liu, Mei
    Griffis, F. H. 'Bud'
    Bates, Andrew J.
    2013 ASEE ANNUAL CONFERENCE, 2013,