The willingness of Kuwait's construction industry in implementing the new and emerging delivery system, the Integrated Project Delivery method (IPD), was explored in this research. As general conclusions to the barriers to IPD are already established by existing literature, this research aims to provide the specific barriers to IPD by evaluating the willingness of non-IPD teams in implementing the principles of IPD. Data was collected from members engaged in multiple construction projects located in Kuwait. Statistical analyses were performed on the collected data to examine differences and similarities in their responses. A Delay Index variable revealed that ongoing Design-Bid-Build (DBB) projects are suffering a delay that amounts to half their original construction duration and that is almost double the delay incurred on Design-Build (DB) projects, which suffered a lesser delay. The data was further analyzed based on the respondents’ project delivery system, project sector, years of experience, and project party. The results indicated that the majority of the respondents working in Kuwait were willing to implement most of IPD's principles. Astonishingly, respondents working on DBB projects were more willing to implement the principles of IPD than those working on DB projects. The respondents from both public and private sectors were equally willing. The main contractors were found to be less willing to implement IPD than all other project parties. Moreover, the most prominent barriers prohibiting most respondents from implementing IPD was their unwillingness to sign a contract that includes liability waivers and one that includes IPD's organizational hierarchical structure. The findings of this research contribute to the current body of knowledge by exploring the construction industry's willingness to implement IPD and simultaneously identifying the specific barriers to its implementation. The findings of this research contribute to the current body of knowledge by exploring the construction industry's willingness to implement IPD and by simultaneously identifying the specific barriers to its implementation, as well as identifying where these barriers lie. These findings may be used as evidence by owners or industry pioneers in promoting the implementation of IPD in their respective organizations. © 2022 The Authors
引用
收藏
页码:543 / 551
相关论文
共 50 条
  • [1] Barriers to adopting integrated project delivery practices
    Ma, Qiuwen
    Li, Shan
    Teo, Pei Xin
    Ling, Florence Yean Yng
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 4171 - 4191
  • [2] Critical success factors for implementing integrated construction project delivery
    Whang, Seoung-Wook
    Park, Kenneth Sungho
    Kim, Sangyong
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2432 - 2446
  • [3] Experiences from Implementing a Collaborative Project Delivery Method
    Engebo, Atle
    Rygh, Julian Andreas Moen
    Klakegg, Ole Jonny
    Lohne, Jardar
    Laedre, Ola
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 327 - 341
  • [4] A framework for implementing integrated project delivery in architecture design firms in Egypt
    Othman, Ayman Ahmed Ezzat
    Youssef, Lamis Yasser Wagih
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (03) : 721 - 757
  • [5] Integrated Project Delivery Method to Sustainable Construction
    Chen, Zixiang
    Liu, Ping
    Yang, Yunhui
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017), 2017, 76 : 777 - 781
  • [6] Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia
    Durdyev, Serdar
    Hosseini, M. Reza
    Martek, Igor
    Ismail, Syuhaida
    Arashpour, Mehrdad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (01) : 186 - 204
  • [7] Transforming project delivery: integrated project delivery
    Ashcraft, Howard
    OXFORD REVIEW OF ECONOMIC POLICY, 2022, 38 (02) : 369 - 384
  • [8] Exploring performance of the integrated project delivery process on complex building projects
    Mesa, Harrison A.
    Molenaar, Keith R.
    Alarcon, Luis F.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) : 1089 - 1101
  • [9] Enablers and Barriers in Implementing Integrated Care
    Maruthappu, Mahiben
    Hasan, Ali
    Zeltner, Thomas
    HEALTH SYSTEMS & REFORM, 2015, 1 (04) : 250 - 256
  • [10] Solutions to Overcome Integrated Project Delivery Implementation Barriers: A Meta-Synthesis Approach
    Kahvandi, Zahra
    Melhado, Silvio
    Viana, Marina L.
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2023, 28 (01) : 63 - 89