Contractual Guidelines for Promoting Integrated Project Delivery

被引:19
|
作者
Ahmed, Muaz O. [1 ]
Nabi, Mohamad Abdul [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
Caranci, Dustin [1 ]
Eberle, Jackson [1 ]
Hawkins, Zachary [1 ]
Sparrow, Ross [1 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
关键词
Integrated project delivery (IPD); Project delivery methods; Contractual guidelines; Construction claims; Construction disputes; Construction management;
D O I
10.1061/(ASCE)CO.1943-7862.0002173
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) was originally developed to overcome the challenges associated with increased project complexity, high fragmentation levels of the construction industry, and inadequate interoperability among the different stakeholders. Despite its documented benefits on project performance, IPD adoption is still witnessing a slow uptake in the US. Recent research studies have tied such slow adoption-in part-to the lack of contractual understanding and implementation of IPD. This paper addresses this critical research need. To this end, the authors used an interdependent research methodology consisting of (1) selection of IPD agreements; (2) identification of the main contractual IPD issues of concern that may lead to conflicts, claims, and/or disputes between the contracting parties through analysis of seven various IPD case study projects; and (3) reviewing and analyzing the contractual provisions, relevant to the identified IPD issues of concern, under the most pertinent national IPD standard forms of contracts. It is worth noting that in order to assure the scientific rigor of this research, the authors consulted throughout all methodological steps and verified research outcomes with the construction group of a leading legal firm. Results show that the major areas of concern in relation to contractual management of IPD processes include risks and incentives; liabilities and indemnification; suspension and termination; insurance; data sharing; and, dispute resolution. This study contributes to the body of knowledge by providing (1) a comparative analysis showing how these issues have been tackled under leading IPD standard forms of contracts; and (2) contractual guidelines to promote better understanding of effective and efficient IPD practices. As such, this research offers substantial practical implications through furnishing insightful information about causes of disputes in IPD agreements as well as how the most popular IPD contracts in the US handle them, and finally, checklist questions to serve as a reference for the contracting parties in negotiating the terms governing their IPD projects. Ultimately, this research should better support changing the contracting culture to better enable and facilitate broader and wider adoption of IPD practices in the US.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Promoting the delivery of integrated care by a tiered approach of training and education
    Burdett, Teresa Marion
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2017, 17
  • [42] Integrated Project Delivery Implementation Challenges in the Construction Industry
    Kahvandi, Zahra
    Saghatforoush, Ehsan
    ZareRavasan, Ahad
    Preece, Christopher
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (08): : 1672 - 1683
  • [43] Automatic Rebar Estimation Algorithms for Integrated Project Delivery
    Lim, Chaeyeon
    Hong, Won-Kee
    Lee, Donghoon
    Kim, Sunkuk
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2016, 15 (03) : 411 - 418
  • [44] Modern Construction: Lean Project Delivery and Integrated Practices
    Sacks, Rafael
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2013, 31 (04) : 394 - +
  • [45] The expansion of Integrated Project Delivery to the life cycle approach
    Juenger, H. C.
    Hofmann, A.
    Schneebecke, J.
    Scharpf, S.
    Auch, N.
    BAUINGENIEUR, 2022, 97 (09): : 298 - 305
  • [46] THE PROPENSITY OF BUILDING INFORMATION MODELLING AND INTEGRATED PROJECT DELIVERY IN BUILDING CONSTRUCTION PROJECT
    Salleh, Rozana Mohamed
    Mustaffa, Nur Emma
    Rahiman, Nafisah Abdul
    Ariffin, Hamizah Liyana Tajul
    Othman, Norazam
    INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2019, 6 (1-2): : 83 - 90
  • [47] New VRF system: For an office building project using integrated project delivery
    Parolise, Amanda
    Engineered Systems, 2019, 36 (02):
  • [48] Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode
    Zhang L.
    Li Y.
    Wu Q.
    Zhang, L. (tjzly126@126.com), 1600, Springer (94): : 109 - 115
  • [49] Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems
    El Asmar, Mounir
    Hanna, Awad S.
    Loh, Wei-Yin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (11)
  • [50] Contractual Guidelines for Management of Infrastructure Transportation Projects
    Elsayegh, Amr
    El-adaway, Islam H.
    Assaad, Rayan
    Ali, Gasser
    Abotaleb, Ibrahim
    Smith, Christopher
    Bootwala, Mustafa
    Eteifa, Seif
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (03)