Technologies on Safe Construction Ventilation of Long-large Shield Tunnel with Low Gas in Metro

被引:0
|
作者
Zhao, Wei [1 ]
Meng, Qingming [2 ]
Liu, Qi [1 ]
Zhang, Mengheng [3 ]
Li, Wei [4 ]
机构
[1] Sinohydro Bur 5Co LTD, Chengdu, Sichuan, Peoples R China
[2] Power China Railway Construct Co Ltd, Beijing, Peoples R China
[3] Shanghai 1 Metro Operat Co Ltd, Shanghai, Peoples R China
[4] Shanghai Inst Technol, Shanghai, Peoples R China
关键词
D O I
10.1088/1755-1315/632/2/022075
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Taking the project of long-large shield tunnel with low gas in Xingtian section of Chengdu Metro Line 18 as an example, A new construction ventilation method is established, which includes: the main tunnel ventilation with axial fans installed at the entrance of the tunnel and the local ventilation with jet fans installed in the shield and at the upper part of the bridge and the top of the 4# trailer for the rear supporting system; the connecting passage ventilation with a jet fan installed on the wall; the crossing ventilation with a jet fan installed in the middle of tunnel. The ventilation technology for safe construction of Metro long-large shield tunnel with low gas is established after detailed calculation of the fan selection, which is applied to finish safely and quickly construction task, and which provides reference for similar projects in the future.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Metro Barcelona Linea 9 -: Europe's greatest metro project with shield tunnel boring machines of large diameters
    Gabarró, XBI
    Frech, RBI
    Maidl, B
    Della Valle, N
    (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 637 - 643
  • [42] Development status and key technologies of unmanned transportation of shield tunnel construction materials
    Yazhou Z.
    Siyuan L.
    Zhanhu Y.
    Wenli X.
    Qi H.
    Jianping H.
    Decheng Z.
    Hui L.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2022, 55 : 58 - 65
  • [43] The influence of long distance overlapping shield tunnel construction on the formed tunnel and appropriate countermeasures
    Li, Zhaoping
    Wang, Kai
    Jiang, Houting
    Yang, Kang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2020, 53 : 174 - 179
  • [44] North/South Metro Line Amsterdam - Shield Transfer System (STS) - a technical innovation for the construction of a metro tunnel in urban environment
    Friedemann, Wolf
    Fennker, Jens-Ruediger
    Schwitte, Marion
    Otten, Frank
    BAUTECHNIK, 2013, 90 (03) : 151 - 161
  • [45] Analysis of Deformation Characteristics of Large Diameter Shield Tunnel with Construction Load
    Zhu, Weidong
    Zhang, Xiwen
    Zhang, Liangliang
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, 2022, : 455 - 461
  • [46] Comparative Analysis of Schemes for Metro Station Built by Enlarging Large-Diameter Shield Tunnel
    Yan, Mei
    Yang, Xiuren
    Li, Aimin
    Wang, Wenjun
    Ding, Deyun
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2731 - +
  • [47] Safety analysis for metro station constructed by enlarging large diameter shield tunnel with mining method
    Li, Xiwei
    Zheng, Hao
    Wang, Quanxian
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2016, 49 (09): : 96 - 102
  • [48] Numerical simulation of TBM construction ventilation in a long diversion tunnel
    Wang, Xiaoling
    Zhang, Ziqiang
    Zhou, Zhengyin
    Chen, Hongchao
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (04) : 560 - 572
  • [49] Ground movements due to the construction of cut-and-cover structures and slurry shield tunnel of the Cairo Metro
    Hamza, M
    Ata, A
    Roussin, A
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (03) : 281 - 289
  • [50] Research on safety risk factors of metro shield tunnel construction in China based on social network analysis
    Pan, Haize
    Huang, Hulongyi
    Luo, Zhenhua
    Wu, Chengjin
    Yang, Sidi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,