Technologies on Safe Construction Ventilation of Long-large Shield Tunnel with Low Gas in Metro

被引:0
|
作者
Zhao, Wei [1 ]
Meng, Qingming [2 ]
Liu, Qi [1 ]
Zhang, Mengheng [3 ]
Li, Wei [4 ]
机构
[1] Sinohydro Bur 5Co LTD, Chengdu, Sichuan, Peoples R China
[2] Power China Railway Construct Co Ltd, Beijing, Peoples R China
[3] Shanghai 1 Metro Operat Co Ltd, Shanghai, Peoples R China
[4] Shanghai Inst Technol, Shanghai, Peoples R China
关键词
D O I
10.1088/1755-1315/632/2/022075
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Taking the project of long-large shield tunnel with low gas in Xingtian section of Chengdu Metro Line 18 as an example, A new construction ventilation method is established, which includes: the main tunnel ventilation with axial fans installed at the entrance of the tunnel and the local ventilation with jet fans installed in the shield and at the upper part of the bridge and the top of the 4# trailer for the rear supporting system; the connecting passage ventilation with a jet fan installed on the wall; the crossing ventilation with a jet fan installed in the middle of tunnel. The ventilation technology for safe construction of Metro long-large shield tunnel with low gas is established after detailed calculation of the fan selection, which is applied to finish safely and quickly construction task, and which provides reference for similar projects in the future.
引用
收藏
页数:8
相关论文
共 50 条
  • [31] Technology on Settlement Control of Large Diameter Shield Traversing Closely Beneath High-pressure Gas Pipeline for Metro Tunnel
    Li, Xinqiang
    Wen, Renguang
    Li, Wei
    Pan, Zhiwei
    Wang, Fuqian
    Shen, Peng
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [32] Distribution of harmful gas and ventilation length design of high altitude long gas tunnel construction: a case study
    Zhang, Xueqiang
    Hu, Juyi
    Zhang, Danfeng
    Cai, Shuang
    Yang, Feng
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [33] Analysis and Prediction of Long-Term Settlement of Metro Shield Tunnel in Saturated Sand
    Jianzheng Liu
    Yixin Yang
    Chunjie Yang
    Geotechnical and Geological Engineering, 2021, 39 : 5241 - 5252
  • [34] Study on the Interaction of Metro Shield Tunnel Construction Under-Crossing the Existing Longhai Railway
    Bao Liu
    Danhui Xi
    Ping Xu
    Geotechnical and Geological Engineering, 2020, 38 : 2159 - 2168
  • [35] Controlling of construction parameters on metro shield tunneling traversing adjacently under the existing subway tunnel
    Zou, Chunhua
    Zhou, Shunhua
    Sun, Yuyong
    Dai, Renping
    Wang, Changdan
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 208 - 212
  • [36] Model Test Study on Metro Shield Construction Undercrossing Existing Open-Cut Tunnel
    Liu Y.
    Cao Y.
    Wu X.
    Fan H.
    Zhou Y.
    Song Y.
    Lin J.
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (01): : 110 - 121
  • [37] Application of Hydrostatic Leveling System in Metro Monitoring for Construction Deep Excavation above Shield Tunnel
    Yin, Zhizheng
    MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1509 - 1513
  • [38] Stress monitoring and internal force analysis of Guangzhou metro shield tunnel segment during construction
    Guangzhou Institute of Building Science, Guangzhou 510440, China
    Tumu Gongcheng Xuebao, 2009, 3 (118-124):
  • [39] Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
    Xu, Yong
    Xia, Ming
    Zhang, Wei
    Li, Zheyu
    Zhang, Zhiqiang
    JOURNAL OF ENGINEERING, 2022, 2022
  • [40] Study on the Interaction of Metro Shield Tunnel Construction Under-Crossing the Existing Longhai Railway
    Liu, Bao
    Xi, Danhui
    Xu, Ping
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (02) : 2159 - 2168