共 14 条
- [1] Monitoring for construction of the North/South metro line in Amsterdam, The Netherlands Geotechnical Aspects of Underground Construction in Soft Ground, 2006, : 745 - 749
- [3] Applying the lost shield method by freezing to connect bored tunnels to Rokin station on the North/South metro line, Amsterdam UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1559 - 1566
- [4] Influences of shield tunnel construction of double-line metro on settlement of existing pipeline Wang, X.C. (xcwang2008@foxmail.com), 1600, Eastern Macedonia and Thrace Institute of Technology (13): : 167 - 173
- [5] Soil grouting: Full scale injection test North/South metro line Amsterdam TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 975 - 980
- [6] Pile and surface settlements at full scale tests North/South metro line Amsterdam TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 981 - 986
- [7] Deep excavations for Amsterdam Metro North-South line: An update and lessons learned GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 37 - 45
- [9] Evaluation of InSAR data for measuring the surface settlement during shield tunnel construction of the North-South Line in Amsterdam GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2021, : 137 - 144
- [10] Application of Hydrostatic Leveling System in Metro Monitoring for Construction Deep Excavation above Shield Tunnel MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1509 - 1513