Soil grouting: Full scale injection test North/South metro line Amsterdam

被引:0
|
作者
van der Stoel, AEC [1 ]
Holtrop, EF [1 ]
van Tol, AF [1 ]
机构
[1] Design Off N S Metro Line, Amsterdam, Netherlands
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper deals some aspects of the design of the North/South metro line Amsterdam. When using the shield tunnelling method for construction of the metro tunnels, complications with some historical buildings founded on pile foundations, due to settlements, will most probably occur. In order to increase the strength and stiffness properties of the soil by means of injection, mitigating measures are planned at these places. In general, the lack of experience with injection in the vicinity of pile foundations, in combination with the fact that the non homogeneous, stratified soil in Amsterdam has been injected only limited, has led to the development of the "Full Scale Injection Test". This paper will outline the injection techniques, geophysical survey and soil investigations planned for the test. Information has to be gained concerning amongst others: injection pressures, grout-take and dimensions and physical properties of the injection body.
引用
收藏
页码:975 / 980
页数:6
相关论文
共 50 条
  • [1] Full scale injection test North/South Metroline Amsterdam
    van der Stoel, AEC
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 191 - 197
  • [2] Pile and surface settlements at full scale tests North/South metro line Amsterdam
    Teunissen, EAH
    Hutteman, M
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 981 - 986
  • [3] Injection/grouting near pile foundations: Full scale test Amsterdam
    van der Stoel, AEC
    van Tol, AF
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 313 - 317
  • [4] Monitoring for construction of the North/South metro line in Amsterdam, The Netherlands
    van der Poel, J. T.
    Gastine, E.
    Kaalberg, E. J.
    Geotechnical Aspects of Underground Construction in Soft Ground, 2006, : 745 - 749
  • [5] North/South Metro Line, Amsterdam, The Netherlands Technical challenges in immersed tunnelling
    de Wit, J. C. W. M.
    van Westendorp, P.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 121
  • [6] Full scale injection test Amsterdam: Results stage 1 and 2
    van der Stoel, AEC
    van Tol, AF
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 633 - 637
  • [7] Deep excavations for Amsterdam Metro North-South line: An update and lessons learned
    van Tol, A. F.
    Korff, M.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 37 - 45
  • [8] North/South Metro Line Amsterdam - Shield Transfer System (STS) - a technical innovation for the construction of a metro tunnel in urban environment
    Friedemann, Wolf
    Fennker, Jens-Ruediger
    Schwitte, Marion
    Otten, Frank
    BAUTECHNIK, 2013, 90 (03) : 151 - 161
  • [9] Stuff. Catalogue of Archaeological Finds from Amsterdam's North/South Metro Line.
    Poulain, Maxime
    POST-MEDIEVAL ARCHAEOLOGY, 2019, 53 (03) : 441 - 442
  • [10] Applying the lost shield method by freezing to connect bored tunnels to Rokin station on the North/South metro line, Amsterdam
    Kleinlugtenbelt, R. E.
    Drijver, R. N.
    Haring, F. P. H.
    Schulze, C.
    Friedemann, W.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1559 - 1566