- [1] Full scale injection test North/South Metroline Amsterdam GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 191 - 197
- [2] Pile and surface settlements at full scale tests North/South metro line Amsterdam TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 981 - 986
- [3] Injection/grouting near pile foundations: Full scale test Amsterdam GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 313 - 317
- [4] Monitoring for construction of the North/South metro line in Amsterdam, The Netherlands Geotechnical Aspects of Underground Construction in Soft Ground, 2006, : 745 - 749
- [6] Full scale injection test Amsterdam: Results stage 1 and 2 CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 633 - 637
- [7] Deep excavations for Amsterdam Metro North-South line: An update and lessons learned GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 37 - 45
- [10] Applying the lost shield method by freezing to connect bored tunnels to Rokin station on the North/South metro line, Amsterdam UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1559 - 1566