Full scale injection test North/South Metroline Amsterdam

被引:0
|
作者
van der Stoel, AEC [1 ]
机构
[1] North South Metroline, Amsterdam, Netherlands
关键词
injection; geophysical surveys; permeation grouting; test;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper outlines the injection techniques, geophysical surveys and special soil investigations techniques used in stage 2 of the "Full Scale Injection Test". Objective of this stage was determining critical parameters concerning the injectability of the Amsterdam soil. Outlined are amongst others: predictions, specialised soil investigation techniques, measured injection pressures and flow (grout-take), laboratory tests, physical properties of the injection body and usability of geophysical surveys to determine the dimensions of the injection-body. Graphs and tables of the test-results are presented and conclusions are drawn from the results available at the moment of submitting this paper (November '98).
引用
收藏
页码:191 / 197
页数:7
相关论文
共 50 条
  • [1] Amsterdam's North/South Metroline
    van Hasselt, DRS
    Hentschel, V
    Hutteman, M
    Kaalberg, FJ
    van Liebergen, JCG
    Netzel, H
    Snel, AJM
    Teunissen, EAH
    de Wit, JCWM
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (02) : 191 - 210
  • [2] Amsterdam's North/South Metroline
    Van Hasselt, D.R.S.
    Hentschel, V.
    Hutteman, M.
    Kaalberg, F.J.
    Van Liebergen, J.C.G.
    Netzel, H.
    Snel, A.J.M.
    Teunissen, E.A.H.
    De Wit, J.C.W.M.
    Tunnelling and Underground Space Technology, 14 (02): : 191 - 210
  • [3] Soil grouting: Full scale injection test North/South metro line Amsterdam
    van der Stoel, AEC
    Holtrop, EF
    van Tol, AF
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 975 - 980
  • [4] Safety and security in the Amsterdam North/South Metroline
    Snel, AJM
    van Liebergen, JCG
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 99 - 103
  • [5] Settlement risk management with GIS for the Amsterdam North South Metroline
    Netzel, H
    Kaalberg, FJ
    CHALLENGES FOR THE 21ST CENTURY, VOL I: INVESTIGATIONS, PLANNING AND DESIGN/UNDERGROUND SPACE USE/SUPPORT AND LINING OF TUNNELS, 1999, : 129 - 136
  • [6] Safety approach of mass transit metrosystern North/South Metroline, Amsterdam
    Snel, AJM
    (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 233 - 237
  • [7] Full scale injection test Amsterdam: Results stage 1 and 2
    van der Stoel, AEC
    van Tol, AF
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 633 - 637
  • [8] Injection/grouting near pile foundations: Full scale test Amsterdam
    van der Stoel, AEC
    van Tol, AF
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 313 - 317
  • [9] Risk management in the Amsterdam North South Metroline: A matter of process-communication instead of calculation
    Snel, AJM
    van Hasselt, DRS
    CHALLENGES FOR THE 21ST CENTURY, VOL I: INVESTIGATIONS, PLANNING AND DESIGN/UNDERGROUND SPACE USE/SUPPORT AND LINING OF TUNNELS, 1999, : 179 - 186
  • [10] Pile and surface settlements at full scale tests North/South metro line Amsterdam
    Teunissen, EAH
    Hutteman, M
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 981 - 986