A BIM-Based Quality Inspection System Prototype for Temporary Construction Works

被引:4
|
作者
Choi, Chang Hoon [1 ]
Lee, Junbok [2 ]
机构
[1] Junglim Architecture, CM Lab, Seoul 04526, South Korea
[2] Kyung Hee Univ, Coll Engn, Dept Architectural Engn, Yongin 17104, South Korea
基金
新加坡国家研究基金会;
关键词
BIM; quality inspection; temporary construction works;
D O I
10.3390/buildings12111931
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction project, the temporary work is the construction work, which is installed temporarily for the construction of main structure and removed after its completion. Even though it is a temporary facility used and demolished only during the construction phase, it accounts for about 10% of the total construction cost. In addition, it is an important work directly connected to the cost and quality of construction, so that the completeness of the building depends on the technology of the temporary work. Therefore, it is necessary to manage it through systematic quality inspection activities. In order to perform a systematic quality inspection, it is essential that detailed and specific inspection activities, such as inspecting the conformity of the design and construction and its compliance with relevant standards based on construction inspection information, such as drawings, specifications, and checklists, are carried out. However, most of the construction inspection information about the temporary work does not include any specific information in documents (drawings, specifications, etc.). Additionally, the direct temporary work among the temporary works is treated as an auxiliary work of the main structure work in the construction site, although it is the construction work based on the work breakdown structure. Accordingly, the quality control engineer must manually check only the contents of the temporary work among the construction inspection information that covers the overall construction work. Additionally, the probability of human error is increased, as the quality control engineer manually carries out the quality inspection tasks, such as preparing the inspection-related materials and checklist and writing the inspection result report. This leads to inefficiency and problems such as re-provisioning for inspection and re-inspection. Therefore, it is necessary to construct a business process that can efficiently carry out the quality inspection work by complementing and improving the above problems involving the temporary work, which is performed most inefficiently. In this study, a BIM-based quality inspection system prototype for temporary works was developed that can automate tasks and systematically store and manage various types of inspection information for each of the temporary facilities in order to improve the efficiency of the quality inspection carried out by the quality control engineer. As a result, a process designed to improve the quality inspection of the temporary work, which can perform the quality inspection work, is proposed. Additionally, the quality of the works related to quality control is improved through improvements in the accuracy and efficiency of the works and simplification of the existing manual work procedures through the proposed business improvement process.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] Offsite construction: Developing a BIM-Based optimizer for assembly
    Gbadamosi, Abdul-Quayyum
    Mahamadu, Abdul-Majeed
    Oyedele, Lukumon O.
    Akinade, Olugbenga O.
    Manu, Patrick
    Mahdjoubi, Lamine
    Aigbavboa, Clinton
    JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 1180 - 1190
  • [32] BIM-based code checking for construction health and safety
    Getuli, Vito
    Ventura, Silvia Mastrolembo
    Capone, Pietro
    Ciribini, Angelo L. C.
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 454 - 461
  • [33] Challenges in construction readiness for BIM-based building projects
    Radzi, Afiqah R.
    Azmi, Nur Farhana
    Kamaruzzaman, Syahrul Nizam
    Algahtany, Mohammed
    Rahman, Rahimi A.
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [34] A BIM-Based Code Checking Approach for Green Construction
    Jiang, Shaohua
    Wu, Zheng
    ICCREM 2017: INDUSTRY REGULATION AND SUSTAINABLE DEVELOPMENT, 2017, : 156 - 163
  • [35] Recognition of process patterns for BIM-based construction schedules
    Sigalov, Kateryna
    Konig, Markus
    ADVANCED ENGINEERING INFORMATICS, 2017, 33 : 456 - 472
  • [36] BIM-based Mixed Reality Application for Supervision of Construction
    Raimbaud, Pierre
    Lou, Ruding
    Merienne, Frederic
    Danglade, Florence
    Figueroa, Pablo
    Tiberio Hernandez, Jose
    2019 26TH IEEE CONFERENCE ON VIRTUAL REALITY AND 3D USER INTERFACES (VR), 2019, : 1903 - 1907
  • [37] Application of PKPM BIM-based Construction Management Platform
    LI Zhi
    WANG Jing
    SHU Zhiqiang
    Computer Aided Drafting,Design and Manufacturing, 2014, (01) : 74 - 82
  • [38] Development of BIM-Based Tunnel Information Modeling Prototype for Tunnel Design
    Waleed, Qazi Muhammad
    Khan, Rai Waqas Azfar
    Sharafat, Abubakar
    Tanoli, Waqas Arshad
    Zubair, Muhammad Umer
    Qureshi, Hisham Jahangir
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024
  • [39] DEVELOPING CONSTRUCTION DEFECT MANAGEMENT SYSTEM USING BIM TECHNOLOGY IN QUALITY INSPECTION
    Lin, Yu-Cheng
    Chang, Jun-Xiong
    Su, Yu-Chih
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (07) : 903 - 914
  • [40] CONSTRUCTION 3D BIM-BASED KNOWLEDGE MANAGEMENT SYSTEM: A CASE STUDY
    Lin, Yu-Cheng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (02) : 186 - 200