A BIM-Based Quality Inspection System Prototype for Temporary Construction Works

被引:4
|
作者
Choi, Chang Hoon [1 ]
Lee, Junbok [2 ]
机构
[1] Junglim Architecture, CM Lab, Seoul 04526, South Korea
[2] Kyung Hee Univ, Coll Engn, Dept Architectural Engn, Yongin 17104, South Korea
基金
新加坡国家研究基金会;
关键词
BIM; quality inspection; temporary construction works;
D O I
10.3390/buildings12111931
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction project, the temporary work is the construction work, which is installed temporarily for the construction of main structure and removed after its completion. Even though it is a temporary facility used and demolished only during the construction phase, it accounts for about 10% of the total construction cost. In addition, it is an important work directly connected to the cost and quality of construction, so that the completeness of the building depends on the technology of the temporary work. Therefore, it is necessary to manage it through systematic quality inspection activities. In order to perform a systematic quality inspection, it is essential that detailed and specific inspection activities, such as inspecting the conformity of the design and construction and its compliance with relevant standards based on construction inspection information, such as drawings, specifications, and checklists, are carried out. However, most of the construction inspection information about the temporary work does not include any specific information in documents (drawings, specifications, etc.). Additionally, the direct temporary work among the temporary works is treated as an auxiliary work of the main structure work in the construction site, although it is the construction work based on the work breakdown structure. Accordingly, the quality control engineer must manually check only the contents of the temporary work among the construction inspection information that covers the overall construction work. Additionally, the probability of human error is increased, as the quality control engineer manually carries out the quality inspection tasks, such as preparing the inspection-related materials and checklist and writing the inspection result report. This leads to inefficiency and problems such as re-provisioning for inspection and re-inspection. Therefore, it is necessary to construct a business process that can efficiently carry out the quality inspection work by complementing and improving the above problems involving the temporary work, which is performed most inefficiently. In this study, a BIM-based quality inspection system prototype for temporary works was developed that can automate tasks and systematically store and manage various types of inspection information for each of the temporary facilities in order to improve the efficiency of the quality inspection carried out by the quality control engineer. As a result, a process designed to improve the quality inspection of the temporary work, which can perform the quality inspection work, is proposed. Additionally, the quality of the works related to quality control is improved through improvements in the accuracy and efficiency of the works and simplification of the existing manual work procedures through the proposed business improvement process.
引用
收藏
页数:26
相关论文
共 50 条
  • [11] BIM-BASED QUALITY CONTROL FOR SAFETY ISSUES IN THE DESIGN AND CONSTRUCTION PHASES
    Park, Seunghwa
    Kim, Inhan
    ARCHNET-IJAR INTERNATIONAL JOURNAL OF ARCHITECTURAL RESEARCH, 2015, 9 (03) : 111 - 129
  • [12] Ontology for BIM-Based Robotic Navigation and Inspection Tasks
    Bahreini, Fardin
    Nasrollahi, Majid
    Taher, Alhusain
    Hammad, Amin
    BUILDINGS, 2024, 14 (08)
  • [13] BIM-based mixed reality application for bridge inspection
    Martins, Ana Carolina Pereira
    Castellano, Isabele Rocha
    Cesar, Kleos Magalhaes Lenz
    Carvalho, Jose Maria Franco de
    Bellon, Fernando Guss ao
    Oliveira, Diogo Silva de
    Ribeiro, Jose Carlos Lopes
    AUTOMATION IN CONSTRUCTION, 2024, 168
  • [14] Design and Application of Intelligent Construction Quality Inspection System Based on BIM-RFID
    Huo, Hai'e
    Ji, Yanhong
    Xie, Kuihua
    Lu, Yu
    ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [15] BIM-Based Management System for Off-Site Construction Projects
    Jang, YeEun
    Son, JeongWook
    Yi, June-Seong
    APPLIED SCIENCES-BASEL, 2022, 12 (19):
  • [16] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    AUTOMATION IN CONSTRUCTION, 2020, 119
  • [17] A BIM-based Construction Workflow Management Approach
    Yao, Qiyan
    Lu, Yang
    Feng, Yuqiang
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 456 - 460
  • [18] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    Automation in Construction, 2020, 119
  • [19] BIM-Based Knowledge Management in Construction Projects
    Wang, Hao
    Meng, Xianhai
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2018, 9 (02) : 20 - 37
  • [20] BIM-based construction safety risk library
    Collinge, William H.
    Farghaly, Karim
    Mosleh, Mojgan Hadi
    Manu, Patrick
    Cheung, Clara Man
    Osorio-Sandoval, Carlos A.
    AUTOMATION IN CONSTRUCTION, 2022, 141