共 50 条
- [42] Short-interval detailed production scheduling in 300mm semiconductor manufacturing using Mixed Integer and Constraint Programming 2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 148 - +
- [43] Pioneering breakthroughs in implant monitor wafer cost reduction at 300mm IN-LINE METHODS AND MONITORS FOR PROCESS AND YIELD IMPROVEMENT, 1999, 3884 : 77 - 87
- [44] How did 300mm manufacturing become a reality against all odds 2000 5TH INTERNATIONAL SYMPOSIUM ON PLASMA PROCESS-INDUCED DAMAGE, 2000, : 105 - 105
- [45] Manufacturing in the 21st century -: New concept for 300mm fab 2001 SYMPOSIUM ON VLSI TECHNOLOGY, DIGEST OF TECHNICAL PAPERS, 2001, : 1 - 4
- [46] Edge and bevel automated defect inspection for 300mm production wafers in manufacturing 2005 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop: Advancing Semiconductor Manufacturing Excellence, 2005, : 49 - 52
- [47] Monitoring and preventing arc-induced wafer damage in 300mm manufacturing 2004 INTERNATIONAL CONFERENCE ON INTEGRATED CIRCUIT DESIGN AND TECHNOLOGY, 2004, : 131 - 134
- [49] Overlay considerations for 300mm lithography METROLOGY, INSPECTION, AND PROCESS CONTROL FOR MICROLITHOGRAPHY XVII, PTS 1 AND 2, 2003, 5038 : 121 - 125
- [50] Containment of contamination on 300mm furnaces 2000 PROCEEDINGS: INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY, 2000, : 11 - 16