共 50 条
- [21] Vehicle clustering phenomenon in automatic materials handling systems in 300mm semiconductor manufacturing Mater Sci Forum, PART 2 (1129-1134):
- [22] THE HEURISTIC DISPATCHING METHOD OF AUTOMATIC MATERIAL HANDLING SYSTEM IN 300MM SEMICONDUCTOR FABRICATION INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2009, 5 (07): : 1927 - 1935
- [24] Selected implications of photoresist processing in 300mm manufacturing ADVANCES IN RESIST TECHNOLOGY AND PROCESSING XIX, PTS 1 AND 2, 2002, 4690 : 883 - 891
- [25] Stepper registration feedback control in 300mm manufacturing ADVANCED PROCESS CONTROL AND AUTOMATION, 2003, 5044 : 44 - 51
- [26] Microeconomics of metrology, yield, and profitability in 300mm manufacturing ISSM 2000: NINTH INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, PROCEEDINGS, 2000, : 52 - 55
- [27] Resident-entity based simulation of batch chamber tools in 300mm semiconductor manufacturing PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2003, : 1398 - 1405
- [28] Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300mm semiconductor manufacturing 2004 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1- 5, PROCEEDINGS, 2004, : 5301 - 5306
- [29] Enabling facility re-use for 300mm semiconductor manufacturing via integration of automated material handling system and facility design 2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 188 - +
- [30] Expeditious hot lots handling in 300mm semiconductor foundry 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 4677 - +