A 300mm semiconductor manufacturing foreign material reduction initiative

被引:0
|
作者
Long, Christopher W. [1 ]
Sienkiewicz, Thomas [2 ]
机构
[1] IBM Syst & Technol Grp, 1000 River St, Essex Jct, VT 05452 USA
[2] IBM Syst & Technol Grp, Fishkill, NY 12533 USA
关键词
foreign material; tool defect controls; yield enhancement; variability reduction; monitor wafer;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is well established that foreign material (FM) in a semiconductor manufacturing process can result in significant unplanned tool down time, reduced product yields, and potential reliability performance issues. This paper will present an overview of the strategy and subsequent results of a multifaceted effort to reduce FM impact during the ramp up of the IBM 300mm semiconductor manufacturing facility in Hope-well Junction, NY.
引用
收藏
页码:220 / +
页数:2
相关论文
共 50 条
  • [1] A 300-mm semiconductor manufacturing foreign material reduction initiative
    Long, Christopher W.
    Sienkiewicz, Thomas
    Pfeiffer, Gerd
    Guse, Michael
    Peterman, James
    Brendler, Andrew
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2008, 21 (03) : 308 - 315
  • [2] Automated material handling solutions for 300mm semiconductor manufacturing
    Carriker, W
    Giddings, R
    FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 379 - 387
  • [3] Pervasive integrated material handling in 300mm semiconductor manufacturing
    Giddings, RA
    Hunter, JC
    2004 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP: ADVANCING THE SCIENCE AND TECHNOLOGY OF SEMICONDUCTOR MANUFACTURING EXCELLENCE, 2004, : 274 - 278
  • [4] SIMULATION OF A FULL 300MM SEMICONDUCTOR MANUFACTURING PLANT WITH MATERIAL HANDLING CONSTRAINTS
    Kiba, Jean-Etienne
    Lamiable, Gilles
    Dauzere-Peres, Stephane
    Yugma, Claude
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1568 - +
  • [5] Optimization of a simulation for 300mm FAB semiconductor manufacturing
    Park, DongSik
    Han, Youngshin
    Lee, Chilgee
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 5, 2006, 3984 : 260 - 268
  • [6] Litho area cycle time reduction in an advanced 300mm semiconductor manufacturing line
    van der Eerden, Joris
    Saenger, Tim
    Walbrick, Walter
    Niesing, Henk
    Schuurhuis, Ron
    2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 114 - +
  • [7] Design and construction issues for 300mm semiconductor manufacturing facilities
    Merchant, S
    Chasey, A
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 714 - 726
  • [8] CIM for 300mm semiconductor fab
    Luk, A
    PROCESS, EQUIPMENT, AND MATERIALS CONTROL IN INTEGRATED CIRCUIT MANUFACTURING III, 1997, 3213 : 162 - 170
  • [9] China launches - 300mm manufacturing
    Mora, M
    SOLID STATE TECHNOLOGY, 2005, 48 (02) : 63 - +
  • [10] Controlling the margins in 300mm manufacturing
    Bode, CA
    Sonderman, TJ
    SOLID STATE TECHNOLOGY, 2004, 47 (02) : 49 - +