共 50 条
- [42] CONCRETE OPERATIONS OF ARCH GRAVITY DAM REVUE FRANCAISE DE RECHERCHE OPERATIONNELE, 1966, 10 (38): : 93 - 93
- [44] Increasing throughput at Olympic Dam by effective management of the mine bottleneck TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2009, 118 (01): : 33 - 46
- [45] WMC's Olympic Dam faces major furnace repairs E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (08): : 7 - 7
- [47] BHP Billiton Profit Drops; Olympic Dam Study Extended E&MJ-ENGINEERING AND MINING JOURNAL, 2012, 213 (09): : 7 - 8
- [48] OLYMPIC DAM ORE GENESIS - A FLUID-MIXING MODEL ECONOMIC GEOLOGY AND THE BULLETIN OF THE SOCIETY OF ECONOMIC GEOLOGISTS, 1995, 90 (02): : 281 - 307
- [50] Flotation circuit analysis at WMC Ltd Olympic Dam Operation Eighth Mill Operators' Conference, Proceedings: EVOLUTION AND SURVIVAL IN THE MINERALS INDUSTRY, 2003, 2003 (04): : 41 - 51