The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five years the operation underwent two optimisation programs that have increased mine output to the current rate of 3.4 Mtpa of ore. The pre-expansion requirements were annual development of approximately 10 000 m and the placement of around 500 000 m(3)/yr of cemented backfill. Previous to 1995 all hoisting was carried out by the Whenan shaft. The Robinson shaft was commissioned during that year to hoist increasing development mullock tonnages and to allow for increased ore hoist via the Whenan system. In 1996 WMC committed to expanding the output of the operation from 85 000 tpa (1996/97 budget) copper metal to 200 000 tpa. The corresponding increase in mine ore production requires expansion to a nominal rate of 9.0 Mtpa. To achieve these increased tonnages, major hardware installations will include sinking of a third shaft capable of hoisting in excess of 9.5 Mtpa, a rail haulage horizon utilising automatic trains, expansion of the existing backfill plant to a production capacity of over 1.8 million m(3)/yr, increasing long term development rates to 15 000 m/yr and increasing the production drilling and blasting rates in line with the higher stope production output. This paper provides detail into the intended hardware (shafts, equipment, etc) of the mining system, and outlines the intended longterm operation and management of the operation. Of particular note is the background requirement of ensuring existing production targets are met to provide critical cashflows into the project during the period of expansion.
引用
收藏
页码:87 / 94
页数:8
相关论文
共 50 条
  • [21] Improving blister tapping at Olympic Dam
    Jenkins, D
    Campbell, A
    First Extractive Metallurgy Operators' Conference, Proceedings, 2005, 2005 (09): : 95 - 99
  • [22] Sustainable water use at olympic dam
    Torrisi, C.
    Trotta, P.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2009, 118 (3-4): : 193 - 204
  • [23] RTZ AND BP TERMINATE OLYMPIC DAM AGREEMENT
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1989, 190 (11): : 83 - 83
  • [24] Sampling and measurements in the reaction shaft at Olympic Dam
    Jorgensen, F
    Campbell, A
    Taylor, R
    Washington, B
    FIRST EXTRACTIVE METALLURGY OPERATORS' CONFERENCE, PROCEEDINGS, 2005, 2005 (09): : 87 - 93
  • [25] Water management at BHP billiton Olympic dam
    Hocking, A.
    AusIMM New Leaders' Conference 2006: RIDING THE BOOM. THE MINERALS INDUSTRY INTO TOMORROW, 2006, 2006 (02): : 89 - 94
  • [26] Local government pushes Olympic Dam expansion
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (11): : 7 - 7
  • [27] OLYMPIC-DAM - HEADING FOR 1988 STARTUP
    SUTTILL, KR
    E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (11): : 36 - 38
  • [28] The mine management system at Olympic Dam mine
    Youds, S
    MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 637 - 643
  • [29] Engineering the new Olympic Dam backfill system
    Baldwin, G
    Grice, AG
    MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 721 - 734
  • [30] FEASIBILITY STUDY SUPPORTS DEVELOPMENT OF OLYMPIC DAM
    TODD, JC
    E&MJ-ENGINEERING AND MINING JOURNAL, 1985, 186 (08): : 16 - &