摘要
The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five years the operation underwent two optimisation programs that have increased mine output to the current rate of 3.4 Mtpa of ore. The pre-expansion requirements were annual development of approximately 10 000 m and the placement of around 500 000 m(3)/yr of cemented backfill. Previous to 1995 all hoisting was carried out by the Whenan shaft. The Robinson shaft was commissioned during that year to hoist increasing development mullock tonnages and to allow for increased ore hoist via the Whenan system. In 1996 WMC committed to expanding the output of the operation from 85 000 tpa (1996/97 budget) copper metal to 200 000 tpa. The corresponding increase in mine ore production requires expansion to a nominal rate of 9.0 Mtpa. To achieve these increased tonnages, major hardware installations will include sinking of a third shaft capable of hoisting in excess of 9.5 Mtpa, a rail haulage horizon utilising automatic trains, expansion of the existing backfill plant to a production capacity of over 1.8 million m(3)/yr, increasing long term development rates to 15 000 m/yr and increasing the production drilling and blasting rates in line with the higher stope production output. This paper provides detail into the intended hardware (shafts, equipment, etc) of the mining system, and outlines the intended longterm operation and management of the operation. Of particular note is the background requirement of ensuring existing production targets are met to provide critical cashflows into the project during the period of expansion.
引用
收藏
页码:87 / 94
页数:8
相关论文
共 50 条
  • [11] Geotechnical reporting at Olympic Dam Mine
    von Thien, K
    AUSIMM NEW LEADERS' CONFERENCE: THE MINERALS INDUSTRY-FUTURE DIRECTIONS FOR NEW LEADERS', 2004, 2004 (01): : 177 - 179
  • [12] INITIAL DEVELOPMENT ON TARGET AT OLYMPIC DAM
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (04): : 16 - &
  • [13] Australia Approval for Olympic Dam expansion
    不详
    NUCLEAR ENGINEERING INTERNATIONAL, 2011, 56 (689): : 6 - 6
  • [14] Another production delay at Olympic Dam
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2004, 205 (01): : 20 - 20
  • [15] Stope performance at Olympic Dam Mine
    Oddie, M. E.
    Pascoe, M. J.
    9th AusIMM Underground Operators Conference 2005, 2005, 2005 (01): : 265 - 272
  • [16] Sustainable Water Use at Olympic Dam
    Torrisi, C.
    Trotta, P.
    WATER IN MINING 2009, PROCEEDINGS, 2009, (10): : 253 - 263
  • [17] WMC considers Olympic Dam expansion
    不详
    MINING ENGINEERING, 2002, 54 (08) : 8 - 8
  • [18] OLYMPIC DAM IS BEING COMMISSIONED.
    Grad, Paul
    Journal of the Institution of Engineers, Australia, 1988, 60 (16): : 42 - 43
  • [19] OXYGEN SMELTING AND THE OLYMPIC DAM PROJECT
    SMITH, TJA
    POSENER, I
    WILLIAMS, CJ
    CIM BULLETIN, 1987, 80 (902): : 84 - 84
  • [20] PACE QUICKENS AT OLYMPIC DAM.
    Wilson, Maurice
    Australian Mining, 1987, 79 (03) : 6 - 18