The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five years the operation underwent two optimisation programs that have increased mine output to the current rate of 3.4 Mtpa of ore. The pre-expansion requirements were annual development of approximately 10 000 m and the placement of around 500 000 m(3)/yr of cemented backfill. Previous to 1995 all hoisting was carried out by the Whenan shaft. The Robinson shaft was commissioned during that year to hoist increasing development mullock tonnages and to allow for increased ore hoist via the Whenan system. In 1996 WMC committed to expanding the output of the operation from 85 000 tpa (1996/97 budget) copper metal to 200 000 tpa. The corresponding increase in mine ore production requires expansion to a nominal rate of 9.0 Mtpa. To achieve these increased tonnages, major hardware installations will include sinking of a third shaft capable of hoisting in excess of 9.5 Mtpa, a rail haulage horizon utilising automatic trains, expansion of the existing backfill plant to a production capacity of over 1.8 million m(3)/yr, increasing long term development rates to 15 000 m/yr and increasing the production drilling and blasting rates in line with the higher stope production output. This paper provides detail into the intended hardware (shafts, equipment, etc) of the mining system, and outlines the intended longterm operation and management of the operation. Of particular note is the background requirement of ensuring existing production targets are met to provide critical cashflows into the project during the period of expansion.
引用
收藏
页码:87 / 94
页数:8
相关论文
共 50 条
  • [1] Introduction of autonomous loaders to Olympic Dam Operations, Australia
    McHugh, C.
    9th AusIMM Underground Operators Conference 2005, 2005, 2005 (01): : 127 - 131
  • [2] Direct to blister copper smelting at WMC's olympic dam operations
    Anon
    AusIMM Bulletin, 2002, (01):
  • [3] Materials handling at Olympic Dam mine - Olympic Dam aiming for 'gold'
    Bowman, P
    MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 645 - 647
  • [4] Olympic dam project
    Kennedy, Alan
    Mining Magazine, 1988, 159 (05):
  • [5] Effects of alternate methods of conditioning on the reflotation of copper concentrates at WMC (Olympic Dam Operations)
    Quast, K
    Heppner, P
    Newell, R
    Schell, J
    MINPREX 2000: INTERNATIONAL CONGRESS ON MINERAL PROCESSING AND EXTRACTIVE METALLURGY, 2000, 2000 (05): : 345 - 352
  • [6] OLYMPIC DAM STRIDES AHEAD
    SUTTILL, KR
    E&MJ-ENGINEERING AND MINING JOURNAL, 1994, 195 (01): : 45 - &
  • [7] COMMISSIONING OF THE OLYMPIC DAM SMELTER
    DAY, BE
    NON-FERROUS SMELTING SYMPOSIUM: 100 YEARS OF LEAD SMELTING AND REFINING IN PORT PIRIE, 1989, : 57 - 60
  • [8] NIMCIX columns for Olympic Dam
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1998, 199 (11): : 90 - 90
  • [9] Mintek technology for olympic dam?
    Mining Magazine, 1996, 174 (06):
  • [10] Recent developments at Olympic Dam
    Thomas, DE
    DIVERSITY: THE KEY TO PROSPERITY, 1996, 96 (01): : 191 - 195