Safety stock or safety lead time: coping with unreliability in demand and supply

被引:48
|
作者
van Kampen, Tim J. [1 ]
van Donk, Dirk Pieter [1 ]
van der Zee, Durk-Jouke [1 ]
机构
[1] Univ Groningen, Fac Econ & Business, Groningen, Netherlands
关键词
advance demand information; material requirements planning; safety lead time; safety stock; simulation; UNCERTAINTY; INFORMATION; SYSTEM; ENVIRONMENTS; MODEL;
D O I
10.1080/00207540903348346
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Safety stock and safety lead time are common measures used to cope with uncertainties in demand and supply. Typically, these uncertainties are studied in isolated instances, ignoring settings with uncertainties both in demand and in supply. The current literature largely neglects case study based contexts and, often, single product situations are investigated in which machine set-ups are not considered. Based on the problems and findings in a case study, we investigate the effects of safety stock and safety lead time on delivery performance in a multi-product setting. The outcomes of the extensive simulation study indicate that utilising a safety lead time results in a higher delivery performance where there is a variable supply, whereas having a safety stock results in a higher delivery performance where there is unreliable demand information. In contrast to earlier findings in the single product situation, this study shows that managers facing the combination of unreliability in demand information and supply variability in a multiple product situation should opt for a safety lead time as the most effective way of improving their delivery performance.
引用
收藏
页码:7463 / 7481
页数:19
相关论文
共 50 条
  • [41] USING SIMULATION TO DETERMINE THE SAFETY STOCK LEVEL FOR INTERMITTENT DEMAND
    Persson, Fredrik
    Axelsson, Minna
    Edlund, Fredrik
    Lanshed, Christoffer
    Lindstrom, Agnes
    Persson, Frida
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3768 - 3779
  • [42] Optimising safety stock placement and lead time in an assembly supply chain using bi-objective MAX-MIN ant system
    Moncayo-Martinez, Luis A.
    Zhang, David Z.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (01) : 18 - 28
  • [43] A genetic algorithm for a single product network design model with lead time and safety stock considerations
    Sourirajan, Karthik
    Ozsen, Leyla
    Uzsoy, Reha
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (02) : 599 - 608
  • [44] Analytical evaluation of lead-time demand in polytree supply chains with uncertain demand, lead-time and inter-demand time
    Mekhtiev, Mirza Arif
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (01) : 304 - 317
  • [45] STOCK CONTROL FOR GAMMA-DISTRIBUTION LEAD TIME DEMAND
    SCULLI, D
    LAM, MC
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1984, 12 (04): : 403 - 405
  • [46] Optimizing Safety Stock in Manufacturing Supply Chain Management: A System
    Patel, Rakesh
    Rodrigues, Lewlyn L. R.
    Kamath, Vasanth
    2010 12TH INTERNATIONAL CONFERENCE ON COMPUTER MODELLING AND SIMULATION (UKSIM), 2010, : 386 - 391
  • [47] The impact of operations redesign on the safety stock investment in supply chains
    Xiaohang Yue
    International Journal of Flexible Manufacturing Systems, 2007, 19 : 516 - 532
  • [48] Inventory policies and safety stock optimization for supply chain planning
    Brunaud, Braulio
    Lainez-Aguirre, Jose M.
    Pinto, Jose M.
    Grossmann, Ignacio E.
    AICHE JOURNAL, 2019, 65 (01) : 99 - 112
  • [49] The impact of operations redesign on the safety stock investment in supply chains
    Yue, Xiaohang
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2007, 19 (04): : 516 - 532
  • [50] SAFETY STOCK DETERMINATION WITH CORRELATED DEMANDS AND ARBITRARY LEAD TIMES
    FOTOPOULOS, S
    WANG, MC
    RAO, SS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 35 (02) : 172 - 181