Safety stock or safety lead time: coping with unreliability in demand and supply

被引:48
|
作者
van Kampen, Tim J. [1 ]
van Donk, Dirk Pieter [1 ]
van der Zee, Durk-Jouke [1 ]
机构
[1] Univ Groningen, Fac Econ & Business, Groningen, Netherlands
关键词
advance demand information; material requirements planning; safety lead time; safety stock; simulation; UNCERTAINTY; INFORMATION; SYSTEM; ENVIRONMENTS; MODEL;
D O I
10.1080/00207540903348346
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Safety stock and safety lead time are common measures used to cope with uncertainties in demand and supply. Typically, these uncertainties are studied in isolated instances, ignoring settings with uncertainties both in demand and in supply. The current literature largely neglects case study based contexts and, often, single product situations are investigated in which machine set-ups are not considered. Based on the problems and findings in a case study, we investigate the effects of safety stock and safety lead time on delivery performance in a multi-product setting. The outcomes of the extensive simulation study indicate that utilising a safety lead time results in a higher delivery performance where there is a variable supply, whereas having a safety stock results in a higher delivery performance where there is unreliable demand information. In contrast to earlier findings in the single product situation, this study shows that managers facing the combination of unreliability in demand information and supply variability in a multiple product situation should opt for a safety lead time as the most effective way of improving their delivery performance.
引用
收藏
页码:7463 / 7481
页数:19
相关论文
共 50 条
  • [21] Shipment planning and safety stock placement in maritime supply chains with stochastic demand and transportation times
    Yazdani, Majid
    Aouam, Tarik
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 263
  • [22] Optimizing Safety Stock in Cement Industry when the Demand during Lead-time Distributed Generalized Gamma four parameters
    Ghafour, K. M.
    Ramli, R.
    Zaibidi, N. Z.
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2016, 54 (01): : 33 - 40
  • [23] Recursive behavior of safety stock reduction: The effect of lead-time uncertainty
    Wang, Ping
    Hill, James A.
    DECISION SCIENCES, 2006, 37 (02) : 285 - 290
  • [24] Safety stock planning under causal demand forecasting
    Beutel, Anna-Lena
    Minner, Stefan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 140 (02) : 637 - 645
  • [25] A CONDITIONAL EFFECT OF AUTOCORRELATED DEMAND ON SAFETY STOCK DETERMINATION
    MARMORSTEIN, H
    ZINN, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 68 (01) : 139 - 142
  • [26] Construction Material Safety-Stock Determination Under Nonstationary Stochastic Demand and Random Supply Yield
    Lu, Hui
    Wang, Hongwei
    Xie, Yong
    Li, Heng
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2016, 63 (02) : 201 - 212
  • [27] Competition in a Decentralized Supply Chain under Price and Safety Stock Sensitive Stochastic Demand and Buyback Contract
    Sediri, Ibtinen
    Nakade, Koichi
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2010, 4 (03): : 627 - 636
  • [28] Optimization of Two-echelon Supply Chain metering device Safety Stock placement with uncertain demand
    Gong, Ting
    Xu, Jie
    Bian, Wenliang
    Li, Zhongcheng
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [29] LEAD-TIME, INVENTORY, AND SAFETY STOCK CALCULATION IN JOB-SHOP MANUFACTURING
    Sellitto, Miguel Afonso
    ACTA POLYTECHNICA, 2018, 58 (06) : 395 - 401
  • [30] Tabu search heuristic for the network design model with lead time and safety stock considerations
    Lee, Kyoungsun
    Ozsen, Leyla
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 148