Safety stock or safety lead time: coping with unreliability in demand and supply

被引:48
|
作者
van Kampen, Tim J. [1 ]
van Donk, Dirk Pieter [1 ]
van der Zee, Durk-Jouke [1 ]
机构
[1] Univ Groningen, Fac Econ & Business, Groningen, Netherlands
关键词
advance demand information; material requirements planning; safety lead time; safety stock; simulation; UNCERTAINTY; INFORMATION; SYSTEM; ENVIRONMENTS; MODEL;
D O I
10.1080/00207540903348346
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Safety stock and safety lead time are common measures used to cope with uncertainties in demand and supply. Typically, these uncertainties are studied in isolated instances, ignoring settings with uncertainties both in demand and in supply. The current literature largely neglects case study based contexts and, often, single product situations are investigated in which machine set-ups are not considered. Based on the problems and findings in a case study, we investigate the effects of safety stock and safety lead time on delivery performance in a multi-product setting. The outcomes of the extensive simulation study indicate that utilising a safety lead time results in a higher delivery performance where there is a variable supply, whereas having a safety stock results in a higher delivery performance where there is unreliable demand information. In contrast to earlier findings in the single product situation, this study shows that managers facing the combination of unreliability in demand information and supply variability in a multiple product situation should opt for a safety lead time as the most effective way of improving their delivery performance.
引用
收藏
页码:7463 / 7481
页数:19
相关论文
共 50 条
  • [31] Determining Supply Chain Safety Stock Level and Location
    Amirjabbari, Bahareh
    Bhuiyan, Nadia
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (01): : 42 - 71
  • [32] A single-product network design model with lead time and safety stock considerations
    Sourirajan, Karthik
    Ozsen, Leyla
    Uzsoy, Reha
    IIE TRANSACTIONS, 2007, 39 (05) : 411 - 424
  • [33] Supply chain focus dependent safety stock placement
    Gangaraju Vanteddu
    Ratna Babu Chinnam
    Kai Yang
    Oleg Gushikin
    International Journal of Flexible Manufacturing Systems, 2007, 19
  • [34] Safety stock placement problem in capacitated supply chains
    Sitompul, Carles
    Aghezzaf, El-Houssaine
    Dullaert, Wout
    van Landeghem, Hendrik
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4709 - 4727
  • [35] Strategic Safety Stock Placement in Supply Networks with Static Dual Supply
    Klosterhalfen, Steffen T.
    Minner, Stefan
    Willems, Sean P.
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2014, 16 (02) : 204 - 219
  • [36] Supply chain focus dependent safety stock placement
    Vanteddu, Gangaraju
    Chinnam, Ratna Babu
    Yang, Kai
    Gushikin, Oleg
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2007, 19 (04): : 463 - 485
  • [37] A novel approach to safety stock management in an integrated supply chain with controllable lead time and ordering cost reduction using present value
    Tharani, S.
    Uthayakumar, R.
    RAIRO-OPERATIONS RESEARCH, 2020, 54 (05) : 1327 - 1346
  • [38] An Intelligent Safety Stock Computing Agent for Safety Inventory Maintenance in the Supply Chain Environment
    Swain, Satyananda
    Patra, Manas Ranjan
    ADVANCED NETWORK TECHNOLOGIES AND INTELLIGENT COMPUTING, ANTIC 2022, PT I, 2023, 1797 : 438 - 451
  • [39] SAFETY STOCK VERSUS SAFETY TIME IN MRP CONTROLLED PRODUCTION SYSTEMS
    BUZACOTT, JA
    SHANTHIKUMAR, JG
    MANAGEMENT SCIENCE, 1994, 40 (12) : 1678 - 1689
  • [40] A periodic review inventory system under stochastic demand with controllable safety stock, lead time, and price discount under partially backlogged shortages
    Kurdhi, Nughthoh Arfawi
    Doewes, Rumi Iqbal
    Yuliana
    INTERNATIONAL JOURNAL OF VALUE CHAIN MANAGEMENT, 2020, 11 (04) : 328 - 345