Safety stock or safety lead time: coping with unreliability in demand and supply

被引:48
|
作者
van Kampen, Tim J. [1 ]
van Donk, Dirk Pieter [1 ]
van der Zee, Durk-Jouke [1 ]
机构
[1] Univ Groningen, Fac Econ & Business, Groningen, Netherlands
关键词
advance demand information; material requirements planning; safety lead time; safety stock; simulation; UNCERTAINTY; INFORMATION; SYSTEM; ENVIRONMENTS; MODEL;
D O I
10.1080/00207540903348346
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Safety stock and safety lead time are common measures used to cope with uncertainties in demand and supply. Typically, these uncertainties are studied in isolated instances, ignoring settings with uncertainties both in demand and in supply. The current literature largely neglects case study based contexts and, often, single product situations are investigated in which machine set-ups are not considered. Based on the problems and findings in a case study, we investigate the effects of safety stock and safety lead time on delivery performance in a multi-product setting. The outcomes of the extensive simulation study indicate that utilising a safety lead time results in a higher delivery performance where there is a variable supply, whereas having a safety stock results in a higher delivery performance where there is unreliable demand information. In contrast to earlier findings in the single product situation, this study shows that managers facing the combination of unreliability in demand information and supply variability in a multiple product situation should opt for a safety lead time as the most effective way of improving their delivery performance.
引用
收藏
页码:7463 / 7481
页数:19
相关论文
共 50 条
  • [1] DETERMINING SAFETY STOCK IN THE PRESENCE OF STOCHASTIC LEAD TIME AND DEMAND
    EPPEN, GD
    MARTIN, RK
    MANAGEMENT SCIENCE, 1988, 34 (11) : 1380 - 1390
  • [2] Lot size effects on process lead time, lead time demand, and safety stock
    Vaughan, TS
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 100 (01) : 1 - 9
  • [3] Safety stock determination based on parametric lead time and demand information
    Ruiz-Torres, Alex J.
    Mahmoodi, Farzad
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) : 2841 - 2857
  • [4] Forecasting of lead-time demand variance: Implications for safety stock calculations
    Babai, M. Zied
    Dai, Yong
    Li, Qinyun
    Syntetos, Aris
    Wang, Xun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 296 (03) : 846 - 861
  • [5] Safety stock placement in supply chains with demand forecast updates
    Boulaksil, Youssef
    OPERATIONS RESEARCH PERSPECTIVES, 2016, 3 : 27 - 31
  • [6] Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time
    Osman, Hany
    Demirli, Kudret
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 299 - 307
  • [7] Interactive Multiobjective Optimization in Lot Sizing with Safety Stock and Safety Lead Time
    Kania, Adhe
    Sipila, Juha
    Afsar, Bekir
    Miettinen, Kaisa
    COMPUTATIONAL LOGISTICS (ICCL 2021), 2021, 13004 : 208 - 221
  • [8] Lot size effects on process lead time, lead time demand, and safety stock (vol 100, pg 1, 2006)
    Vaughan, T. S.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) : 896 - 896
  • [9] A Recovery Model for Sudden Supply Delay with Demand Uncertainty and Safety Stock
    Paul, Sanjoy Kumar
    Rahman, Shams
    DATA AND DECISION SCIENCES IN ACTION, 2018, : 243 - 257
  • [10] The analysis of safety demand and supply
    Li, HX
    Tian, SC
    Feng, CG
    Xi, YM
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL II, PT A AND B, 2000, 2 : 933 - 936