A multi-parameter optimization technique for prestressed concrete cable-stayed bridges considering prestress in girder

被引:12
|
作者
Gao, Qiong [1 ]
Yang, Meng-Gang [1 ]
Qiao, Jian-Dong [1 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
cable-stayed bridge; prestressed concrete; multi-parameter; optimization technique; prestressing tension; OPTIMUM DESIGN; FORCES; ALGORITHM; ELEMENT; DECKS;
D O I
10.12989/sem.2017.64.5.567
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional design procedure of a prestressed concrete (PC) cable-stayed bridge is complex and time-consuming. The designers have to repeatedly modify the configuration of the large number of design parameters to obtain a feasible design scheme which maybe not an economical design. In order to efficiently achieve an optimum design for PC cable-stayed bridges, a multi-parameter optimization technique is proposed. In this optimization technique, the number of prestressing tendons in girder is firstly set as one of design variables, as well as cable forces, cable areas and cross-section sizes of the girders and the towers. The stress and displacement constraints are simultaneously utilized to ensure the safety and serviceability of the structure. The target is to obtain the minimum cost design for a PC cable-stayed bridge. Finally, this optimization technique is carried out by a developed PC cable-stayed bridge optimization program involving the interaction of the parameterized automatically modeling program, the finite element structural analysis program and the optimization algorithm. A low-pylon PC cable-stayed bridge is selected as the example to test the proposed optimization technique. The optimum result verifies the capability and efficiency of the optimization technique, and the significance to optimize the number of prestressing tendons in the girder. The optimum design scheme obtained by the application can achieve a 24.03% reduction in cost, compared with the initial design.
引用
收藏
页码:567 / 577
页数:11
相关论文
共 50 条
  • [1] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE
    PODOLNY, W
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79
  • [3] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE - COMMENT
    PODOLNY, W
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (05): : 115 - 116
  • [4] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors
    Guan, Hua
    Chen, Dewei
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028
  • [5] An Adjustment Technique for Tensions in the Cables of Concrete Cable-Stayed Bridges considering the Effect of Cable-Girder Temperature Difference
    Ma, Niu-Jing
    Gu, Li-Xiong
    Peng, Chang-Li
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (05) : 1806 - 1815
  • [6] An Adjustment Technique for Tensions in the Cables of Concrete Cable-Stayed Bridges considering the Effect of Cable-Girder Temperature Difference
    Niu-Jing Ma
    Li-Xiong Gu
    Chang-Li Peng
    KSCE Journal of Civil Engineering, 2021, 25 : 1806 - 1815
  • [7] BUCKLING OF CABLE-STAYED GIRDER BRIDGES
    Tang, Man-Chung
    1675, (102):
  • [8] Optimum design of concrete cable-stayed bridges with prestressed decks
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2016, 17 (5-6): : 339 - 349
  • [9] BUCKLING OF CABLE-STAYED GIRDER BRIDGES
    TANG, MC
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1976, 102 (09): : 1675 - 1684
  • [10] Multi-parameter monitoring and pattern recognition applied to cable-stayed bridges model
    Hu, Xiong
    Chen, Zhaoneng
    Tong, Dechun
    Zhu, Jimei
    Shi, Jiajun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2000, 34 (03): : 354 - 359