A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem

被引:28
|
作者
Proon, Sepehr [2 ]
Jin, Mingzhou [1 ]
机构
[1] Mississippi State Univ, Mississippi State, MS 39762 USA
[2] Univ Pittsburgh, Pittsburgh, PA USA
关键词
resource-constrained project scheduling problem; genetic algorithm; neighborhood search; HEURISTICS;
D O I
10.1002/nav.20439
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem (RCPSP) consists of a set of non-preemptive activities that follow precedence relationship and consume resources. Under the limited amount of the resources, the objective of RCPSP is to find a schedule of the activities to minimize the project makespan. This article presents a new genetic algorithm (GA) by incorporating a local search strategy in GA operators. The local search strategy improves the efficiency of searching the solution space while keeping the randomness of the GA approach. Extensive numerical experiments show that the proposed GA with neighborhood search works well regarding solution quality and computational time compared with existing algorithms in the RCPSP literature, especially for the instances with a large number of activities. (C) 2011 Wiley Periodicals, Inc. Naval Research Logistics 58: 73-82, 2011
引用
收藏
页码:73 / 82
页数:10
相关论文
共 50 条
  • [31] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365
  • [32] A branch and bound algorithm for the resource-constrained project scheduling problem
    Brucker, P
    Knust, S
    Schoo, A
    Thiele, O
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 272 - 288
  • [33] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [34] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [35] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [36] A genetic algorithm for solving fuzzy resource-constrained project scheduling
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 171 - 180
  • [37] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [38] A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources
    Delgoshaei, Aidin
    Hanjani, Sepehr Esmaeili
    Nasiri, Amir Hossein
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 195 - 212
  • [39] A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
    Debels, Dieter
    Vanhoucke, Mario
    OPERATIONS RESEARCH, 2007, 55 (03) : 457 - 469
  • [40] A Bi-population based genetic algorithm for the resource-constrained project scheduling problem
    Debels, D
    Vanhoucke, M
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 378 - 387