A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem

被引:28
|
作者
Proon, Sepehr [2 ]
Jin, Mingzhou [1 ]
机构
[1] Mississippi State Univ, Mississippi State, MS 39762 USA
[2] Univ Pittsburgh, Pittsburgh, PA USA
关键词
resource-constrained project scheduling problem; genetic algorithm; neighborhood search; HEURISTICS;
D O I
10.1002/nav.20439
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem (RCPSP) consists of a set of non-preemptive activities that follow precedence relationship and consume resources. Under the limited amount of the resources, the objective of RCPSP is to find a schedule of the activities to minimize the project makespan. This article presents a new genetic algorithm (GA) by incorporating a local search strategy in GA operators. The local search strategy improves the efficiency of searching the solution space while keeping the randomness of the GA approach. Extensive numerical experiments show that the proposed GA with neighborhood search works well regarding solution quality and computational time compared with existing algorithms in the RCPSP literature, especially for the instances with a large number of activities. (C) 2011 Wiley Periodicals, Inc. Naval Research Logistics 58: 73-82, 2011
引用
收藏
页码:73 / 82
页数:10
相关论文
共 50 条
  • [21] A Genetic Algorithm with a New Local Search Method for Solving the Multimode Resource-constrained Project Scheduling Problem
    Afshar, Mohammad Reza
    Shahhosseini, Vahid
    Sebt, Mohammad Hassan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (03) : 357 - 365
  • [22] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474
  • [23] A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem
    Cui, Longqing
    Liu, Xinbao
    Lu, Shaojun
    Jia, Zhaoli
    APPLIED SOFT COMPUTING, 2021, 107
  • [24] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [25] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [26] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [27] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [28] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [29] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [30] Best Insertion Algorithm for Resource-constrained Project Scheduling Problem
    Pesek, Igor
    Zerovnik, Janez
    KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, : 169 - 176