A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem

被引:136
|
作者
Debels, Dieter [1 ]
Vanhoucke, Mario [1 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
关键词
D O I
10.1287/opre.1060.0358
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the last few decades, the resource-constrained project-scheduling problem has become a popular problem type in operations research. However, due to its strongly NP-hard status, the effectiveness of exact optimisation procedures is restricted to relatively small instances. In this paper, we present a new genetic algorithm (GA) for this problem that is able to provide near-optimal heuristic solutions. This GA procedure has been extended by a so-called decomposition-based genetic algorithm (DBGA) that iteratively solves subparts of the project. We present computational experiments on two data sets. The first benchmark set is used to illustrate the performance of both the GA and the DBGA. The second set is used to compare the results with current state-of-the-art heuristics and to show that the procedure is capable of producing consistently good results for challenging problem instances. We illustrate that the GA outperforms all state-of-the-art heuristics and that the DBGA further improves the performance of the GA.
引用
收藏
页码:457 / 469
页数:13
相关论文
共 50 条
  • [1] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [2] Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling
    Saad, Hatem M. H.
    Chakrabortty, Ripon K.
    Elsayed, Saber
    Ryan, Michael J.
    IEEE ACCESS, 2021, 9 : 38488 - 38502
  • [3] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [4] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [5] A late-mover genetic algorithm for resource-constrained project-scheduling problems
    Liu, Yongping
    Huang, Lizhen
    Liu, Xiufeng
    Ji, Guomin
    Cheng, Xu
    Onstein, Erling
    INFORMATION SCIENCES, 2023, 642
  • [6] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [7] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [8] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [9] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, (05) : 376 - 382
  • [10] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382