A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem

被引:136
|
作者
Debels, Dieter [1 ]
Vanhoucke, Mario [1 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
关键词
D O I
10.1287/opre.1060.0358
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the last few decades, the resource-constrained project-scheduling problem has become a popular problem type in operations research. However, due to its strongly NP-hard status, the effectiveness of exact optimisation procedures is restricted to relatively small instances. In this paper, we present a new genetic algorithm (GA) for this problem that is able to provide near-optimal heuristic solutions. This GA procedure has been extended by a so-called decomposition-based genetic algorithm (DBGA) that iteratively solves subparts of the project. We present computational experiments on two data sets. The first benchmark set is used to illustrate the performance of both the GA and the DBGA. The second set is used to compare the results with current state-of-the-art heuristics and to show that the procedure is capable of producing consistently good results for challenging problem instances. We illustrate that the GA outperforms all state-of-the-art heuristics and that the DBGA further improves the performance of the GA.
引用
收藏
页码:457 / 469
页数:13
相关论文
共 50 条
  • [21] A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    Zhu, Guidong
    Bard, Jonathan F.
    Yu, Gang
    INFORMS JOURNAL ON COMPUTING, 2006, 18 (03) : 377 - 390
  • [22] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [23] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [24] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [25] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474
  • [26] A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
    Zamani, Reza
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (02) : 552 - 559
  • [27] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [28] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [29] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [30] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316