Resource dedication problem in a multi-project environment

被引:32
|
作者
Besikci, Umut [1 ]
Bilge, Umit [1 ]
Ulusoy, Gunduz [2 ]
机构
[1] Bogazici Univ, Istanbul, Turkey
[2] Sabanci Univ, Istanbul, Turkey
关键词
Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP; SCHEDULING PROBLEM; GENETIC ALGORITHM; LIMITED RESOURCES; MODES; HEURISTICS; COSTS;
D O I
10.1007/s10696-012-9140-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multi-project scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects' preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
引用
收藏
页码:206 / 229
页数:24
相关论文
共 50 条
  • [21] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [22] OPTIMIZATION OF MULTI-PROJECT ENVIRONMENT (OPMPE)
    Hossain, Lokman
    Ruwanpura, Janaka
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2421 - 2430
  • [23] Combination of genetic & ant colony algorithms for multi-project resource leveling problem
    Li, Jing-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (03): : 643 - 649
  • [24] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem
    Liu, Wenjian
    Li, Jinghua
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082
  • [25] On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
    Wang, Yanting
    He, Zhengwen
    Kerkhove, Louis-Phillipe
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 223 - 234
  • [26] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [27] A Modified Differential Evolution Algorithm for Resource Constrained Multi-project Scheduling Problem
    Yan, Rui
    Li, Weijia
    Jiang, Ping
    Zhou, Yinzhi
    Wu, Guoqing
    JOURNAL OF COMPUTERS, 2014, 9 (08) : 1922 - 1927
  • [28] EXPERIMENTAL IMPLEMENTATION OF A RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM SOLVER
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 2021, 49 (02): : 53 - 58
  • [29] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [30] Multi-project Portfolio Scheduling Problem Considering Skill Evolution of Flexible Resource
    Lu Z.
    Chen C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2021, 48 (10): : 11 - 20