Multi-project Portfolio Scheduling Problem Considering Skill Evolution of Flexible Resource

被引:0
|
作者
Lu Z. [1 ]
Chen C. [1 ]
机构
[1] School of Mechanical Engineering, Tongji University, Shanghai
基金
中国国家自然科学基金;
关键词
Human resource structure; Multi-objective optimization; Project scheduling; Staff training;
D O I
10.16339/j.cnki.hdxbzkb.2021.10.002
中图分类号
学科分类号
摘要
In the aircraft mobile assembly line, the skill level of human resources can be improved through a certain period of learning by doing. For this phenomenon, a multi-project portfolio scheduling problem considering the skill evolution of flexible resource under the known expected human resource structure is proposed, and a mixed integer programming model is established to minimize the number of projects and the total input cost required to achieve the target human resource structure. To solve this model, a hybrid multi-objective teaching optimization algorithm with multi-layer linked list structure encoding is designed, and the neighborhood search is combined to improve the local search ability of the algorithm. Finally, the results of experimental data verify the effectiveness of this model and algorithm. © 2021, Editorial Department of Journal of Hunan University. All right reserved.
引用
收藏
页码:11 / 20
页数:9
相关论文
共 16 条
  • [1] LU Z Q, YANG C., Modeling of resource constrained multi-project scheduling problem based on project splitting, Journal of Shanghai Jiao Tong University, 51, 2, (2017)
  • [2] BELLENGUEZ O, EMMANUEL N., Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills, Practice and Theory of Automated Timetabling V, pp. 229-243, (2005)
  • [3] LIAN J, LIU C G, LI W J, Et al., A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity, Computers & Industrial Engineering, 118, pp. 366-382, (2018)
  • [4] BARZ C, KOLISCH R., Hierarchical multi-skill resource assignment in the telecommunications industry, Production and Operations Management, 23, 3, pp. 489-503, (2014)
  • [5] WALTER M, ZIMMERMANN J., Minimizing average project team size given multi-skilled workers with heterogeneous skill levels, Computers & Operations Research, 70, pp. 163-179, (2016)
  • [6] REN Y F, LU Z Q, LIU X Y., Project scheduling problem with hierarchical levels of skills, Journal of Zhejiang University (Engineering Science), 51, 5, pp. 1000-1006, (2017)
  • [7] MAGHSOUDLOU H, AFSHAR-NADJAFI B, AKHAVAN NIAKI S T., Multi-skilled project scheduling with level-dependent rework risk
  • [8] three multi-objective mechanisms based on cuckoo search, Applied Soft Computing, 54, pp. 46-61, (2017)
  • [9] LIU C, WANG J, LEUNG Y T., Worker assignment and production planning with learning and forgetting in manufacturing cells by hybrid bacteria foraging algorithm, Computers & Industrial Engineering, 96, pp. 162-179, (2016)
  • [10] MEHMANCHI E, SHADROKH S., Solving a new mixed integer non-linear programming model of the multi-skilled project scheduling problem considering learning and forgetting effect on the employee efficiency, 2013 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 400-404, (2013)