共 16 条
- [1] LU Z Q, YANG C., Modeling of resource constrained multi-project scheduling problem based on project splitting, Journal of Shanghai Jiao Tong University, 51, 2, (2017)
- [2] BELLENGUEZ O, EMMANUEL N., Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills, Practice and Theory of Automated Timetabling V, pp. 229-243, (2005)
- [3] LIAN J, LIU C G, LI W J, Et al., A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity, Computers & Industrial Engineering, 118, pp. 366-382, (2018)
- [4] BARZ C, KOLISCH R., Hierarchical multi-skill resource assignment in the telecommunications industry, Production and Operations Management, 23, 3, pp. 489-503, (2014)
- [5] WALTER M, ZIMMERMANN J., Minimizing average project team size given multi-skilled workers with heterogeneous skill levels, Computers & Operations Research, 70, pp. 163-179, (2016)
- [6] REN Y F, LU Z Q, LIU X Y., Project scheduling problem with hierarchical levels of skills, Journal of Zhejiang University (Engineering Science), 51, 5, pp. 1000-1006, (2017)
- [7] MAGHSOUDLOU H, AFSHAR-NADJAFI B, AKHAVAN NIAKI S T., Multi-skilled project scheduling with level-dependent rework risk
- [8] three multi-objective mechanisms based on cuckoo search, Applied Soft Computing, 54, pp. 46-61, (2017)
- [9] LIU C, WANG J, LEUNG Y T., Worker assignment and production planning with learning and forgetting in manufacturing cells by hybrid bacteria foraging algorithm, Computers & Industrial Engineering, 96, pp. 162-179, (2016)
- [10] MEHMANCHI E, SHADROKH S., Solving a new mixed integer non-linear programming model of the multi-skilled project scheduling problem considering learning and forgetting effect on the employee efficiency, 2013 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 400-404, (2013)