Resource dedication problem in a multi-project environment

被引:32
|
作者
Besikci, Umut [1 ]
Bilge, Umit [1 ]
Ulusoy, Gunduz [2 ]
机构
[1] Bogazici Univ, Istanbul, Turkey
[2] Sabanci Univ, Istanbul, Turkey
关键词
Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP; SCHEDULING PROBLEM; GENETIC ALGORITHM; LIMITED RESOURCES; MODES; HEURISTICS; COSTS;
D O I
10.1007/s10696-012-9140-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multi-project scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects' preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
引用
收藏
页码:206 / 229
页数:24
相关论文
共 50 条
  • [41] Efficient Priority Rules for Resource Allocation of Stochastic Decentralized Multi-Project Scheduling Problem
    Mao, Hongri
    Yuan, Jianbo
    Mao, Ying
    Zhang, Shixuan
    IEEE ACCESS, 2024, 12 : 112729 - 112741
  • [42] Two-stage algorithm for resource-constrained multi-project scheduling problem
    Chen J.-J.
    Tong S.-R.
    Ye Z.-G.
    Zhang J.-W.
    Wang Y.
    Nie Y.-F.
    Zhang Y.-Q.
    Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
  • [43] A NOVEL VIBRATION DAMPING OPTIMIZATION ALGORITHM FOR RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    Mehdizadeh, Esmaeil
    Akbari, Hamidreza
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2017, 51 (02): : 291 - 309
  • [44] Models of PMO functioning in a multi-project environment
    Mariusz, Hofman
    SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 46 - 54
  • [45] A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    VIETNAM JOURNAL OF COMPUTER SCIENCE, 2019, 6 (04) : 423 - 437
  • [46] A-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2018, PT II, 2018, 11056 : 243 - 253
  • [47] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [48] Multi-skilled resource-constrained multi-project scheduling problem with dexterity improvement of workforce
    Mozhdehi, Saleh
    Baradaran, Vahid
    Hosseinian, Amir Hossein
    AUTOMATION IN CONSTRUCTION, 2024, 162
  • [49] Research on Multi-project Resource Allocation Process and Application
    Zhang, Xinli
    Li, Jie
    Zhu, Yanfang
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2267 - 2272
  • [50] MULTI-PROJECT RESOURCE ALLOCATION - THE STATE OF THE ART.
    Benjamin, C.O.
    1600, (09):