Genetic Algorithm for TDRS Communication Scheduling with Resource Constraints

被引:3
|
作者
Li, Zong-li [1 ,2 ,3 ]
Meng, Xin [1 ]
Liu, Shu-qian
Zhang, Sheng-lei [4 ]
Zheng, Wei [1 ,2 ]
机构
[1] Chinese Acad Sci, Ctr Space Sci & Appl Res, Beijing 100190, Peoples R China
[2] Grad Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[3] Taiyuan Satellite Launch Ctr, Taiyuan 030027, Peoples R China
[4] Beijing Aerosp Command Control Ctr, Beijing 100094, Peoples R China
关键词
D O I
10.1109/IITA.Workshops.2008.85
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The focus of this paper is dynamic link allocation algorithms for sharing the limited link resources of the Tracking and Data Relay satellites (TDRS) system among many burst users with varying Quality of Service (QoS) requirements. The task of scheduling communications between TDRS link and spacecraft is getting more and more critical since an increasing number of spacecraft must communicate with ground station by the TDRS. In such a congested scenario, the current practice, in which experts build hand-made schedules, often leaves a large number of communication requests un-served This paper proposes a light time-indexed formulation of the problem to include several complex technological constraints. A genetic algorithm is then devised which provides near-optimal solutions of a set of large-scale test problems arising in the TDRS-Spacecraft constellation. As the simulation result, the genetic algorithm shows numerical stability and robustness adequate for practical implementation.
引用
收藏
页码:74 / +
页数:2
相关论文
共 50 条
  • [21] GENRES - EXTENSION OF BROOKS ALGORITHM FOR PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    WHITEHOUSE, GE
    BROWN, JR
    COMPUTERS & INDUSTRIAL ENGINEERING, 1979, 3 (03) : 261 - 268
  • [22] Application of genetic algorithms to construction scheduling with or without resource constraints
    Toklu, YC
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (03) : 421 - 429
  • [23] ALGORITHM FOR OPTIMAL PROJECT SCHEDULING UNDER MULTIPLE RESOURCE CONSTRAINTS
    DAVIS, EW
    HEIDORN, GE
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (12): : B803 - B816
  • [24] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [25] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
    J. Alcaraz
    C. Maroto
    Annals of Operations Research, 2001, 102 : 83 - 109
  • [26] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [27] Blower resource scheduling based on elite genetic algorithm
    Nian, Yang Guang
    Wei, Qi
    Jun, Zhou
    ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 591 - +
  • [28] Dynamic Resource Scheduling Based on Improved Genetic Algorithm
    Gui Yuanyuan
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1972 - 1977
  • [29] A Heuristic-Based Genetic Algorithm for Scheduling of Multiple Projects Subjected to Resource Constraints and Environmental Responsibility Commitments
    Gholizadeh-Tayyar, Shadan
    Okongwu, Uche
    Lamothe, Jacques
    PROCESS INTEGRATION AND OPTIMIZATION FOR SUSTAINABILITY, 2021, 5 (03) : 361 - 382
  • [30] A New Genetic Algorithm for Scheduling for Large Communication Delays
    Pecero, Johnatan E.
    Trystram, Denis
    Zomaya, Albert Y.
    EURO-PAR 2009: PARALLEL PROCESSING, PROCEEDINGS, 2009, 5704 : 241 - +