共 50 条
- [32] A Fuzzy Genetic Algorithm for Single Machine Scheduling and Flexible Maintenance Planning Integration under Human Resource Constraints 2017 IEEE 29TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2017), 2017, : 551 - 558
- [33] Flexible Job-Shop Scheduling with Dual-Resource Constraints to Minimize Tardiness Using Genetic Algorithm 2ND INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE AND 3RD ASIA-PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS (IMEC-APCOMS 2015), 2016, 114
- [34] A Heuristic-Based Genetic Algorithm for Scheduling of Multiple Projects Subjected to Resource Constraints and Environmental Responsibility Commitments Process Integration and Optimization for Sustainability, 2021, 5 : 361 - 382
- [36] Interval Matching Algorithm for Task Scheduling with Time Varying Resource Constraints 2022 18TH INTERNATIONAL CONFERENCE ON MOBILITY, SENSING AND NETWORKING, MSN, 2022, : 942 - 947
- [39] An improved algorithm for parallel machine scheduling under additional resource constraints Optimization Letters, 2023, 17 : 753 - 769