THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT

被引:0
|
作者
Mao, Yihua [1 ]
Xiang, Jianguo
Cheng, Yanhong [1 ]
机构
[1] Zhejiang Univ, Coll Architecture & Civil Engn, Hangzhou, Zhejiang, Peoples R China
关键词
Metro project; BOT; The Life Cycle; Risk Analysis and Management; Fuzzy Synthesis Evaluation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The construction and development in large cities bring the requirement of more and more metros. For the risk of the metro projects under the BOT mode, the index system of evaluation is established on the basis of factors analysis. By questionnaire and experts scoring, the weight of each index is determined through Fuzzy Synthesis Evaluation, after identifying risks using WBS (Work Breakdown Structure). The research comes to the conclusion that when the risk of the whole project is at middle, it means to the inventors that their losing will probably exceed 50%; by adopting BOT mode in the Metro project, the greatest risks will occur at the construction period of the project and the initial stage of the operation, and the risks that the investors will face during different processes are different which means the risks are processed dependently. Then the Life Cycle Integrated Risk Management of Metro was suggested, which could help to make full use of all sources and fulfill the goal of minimizing the risk cost during the life cycle of Metro, and different management strategies in different stages are laid out.
引用
收藏
页码:2415 / 2422
页数:8
相关论文
共 50 条
  • [41] Software Project Total Life Cycle Risk Management Model Based on QFD
    Gu Xiao-yan
    Cai Chen
    2008 INTERNATIONAL WORKSHOP ON INFORMATION TECHNOLOGY AND SECURITY, 2008, : 251 - 255
  • [42] Analysis of the Construction Management of the City House on the Construction Project Life Cycle
    Peng, Yan
    Chen, Yi
    2011 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND MANAGEMENT ENGINEERING (ESME 2011), VOLS 1-5, 2011, : 1406 - 1409
  • [43] Research of Project Investment Control Based on Life Cycle Theory
    Peng, Junli
    Li, Xiao
    MECHANICAL AND ELECTRONICS ENGINEERING III, PTS 1-5, 2012, 130-134 : 1123 - +
  • [44] Integrated risk management in highway project
    Liu, HuiZhong
    Zheng, MaoLin
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 304 - 306
  • [45] Analysis and Estimation on Risk Factors in Engineering Project Life-cycle
    Lin Li
    Fan Li-chu
    Zhuo Wei-dong
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 657 - 661
  • [46] RISK LEVEL ANALYSIS IN THE SELECTED (INITIAL) STAGE OF THE PROJECT LIFE CYCLE
    Borecki, Michal
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2020, 11 (04) : 104 - 112
  • [47] Integrated methodology for project risk management
    del Caño, A
    de la Cruz, MP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (06) : 473 - 485
  • [48] Integrated life-cycle costs analysis and life-cycle assessment model for decision making of construction project
    Gu Yu-rong
    Chang Yuan
    Liu Yi-qun
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 448 - +
  • [49] Product life cycle information and process analysis methodology: Integrated information and process analysis for product life cycle management
    Kim, Gun Y.
    Lee, Ju Y.
    Park, Yang H.
    Noh, Sang D.
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2012, 20 (04): : 257 - 274
  • [50] VERBAL ANALYSIS AND ITS APPLICATION FOR THE ASSESSMENT AND MANAGEMENT OF THE INVESTMENT PROJECT RISK IN CONSTRUCTION
    Shevchenko, Galina
    Ustinovichius, Leonas
    9TH INTERNATIONAL SCIENTIFIC CONFERENCE - BUSINESS AND MANAGEMENT 2016, 2016,