THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT

被引:0
|
作者
Mao, Yihua [1 ]
Xiang, Jianguo
Cheng, Yanhong [1 ]
机构
[1] Zhejiang Univ, Coll Architecture & Civil Engn, Hangzhou, Zhejiang, Peoples R China
关键词
Metro project; BOT; The Life Cycle; Risk Analysis and Management; Fuzzy Synthesis Evaluation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The construction and development in large cities bring the requirement of more and more metros. For the risk of the metro projects under the BOT mode, the index system of evaluation is established on the basis of factors analysis. By questionnaire and experts scoring, the weight of each index is determined through Fuzzy Synthesis Evaluation, after identifying risks using WBS (Work Breakdown Structure). The research comes to the conclusion that when the risk of the whole project is at middle, it means to the inventors that their losing will probably exceed 50%; by adopting BOT mode in the Metro project, the greatest risks will occur at the construction period of the project and the initial stage of the operation, and the risks that the investors will face during different processes are different which means the risks are processed dependently. Then the Life Cycle Integrated Risk Management of Metro was suggested, which could help to make full use of all sources and fulfill the goal of minimizing the risk cost during the life cycle of Metro, and different management strategies in different stages are laid out.
引用
收藏
页码:2415 / 2422
页数:8
相关论文
共 50 条
  • [21] Investment project oriented region integrated management
    Jia, Xiaoxia
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 881 - 887
  • [22] A method of risk analysis about BOT project
    Wang, XQ
    Geng, YS
    Fu, R
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1715 - 1719
  • [23] Evaluation on Risk Analysis for Oversea BOT Project
    Zhang, Ximing
    An, Yuhua
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 428 - 431
  • [24] PUBLIC INVESTMENT PROJECT'S WHOLE LIFE CYCLE COST AND BENEFIT MANAGEMENT MODEL
    Adamsone, Liena
    Feldmane, Andra
    Senfelde, Maija
    7TH INTERNATIONAL SCIENTIFIC CONFERENCE BUSINESS AND MANAGEMENT 2012, 2012, : 585 - 592
  • [25] Study on the Model of Integrated Risk Management for BOT Projects
    Jiang, Gongliang
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
  • [26] The Study on the Real Estate Project Life Cycle Integrated Information Management Pattern
    Wang, Kun
    Hu, Zong
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 8, 2009, : 258 - 262
  • [27] Life-cycle Integrated Management Information System (LMIS) of construction project
    He, QH
    ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1535 - 1542
  • [28] Research on the System of the Construction Project Life Cycle Cost Risk Management
    Wang, Hongping
    Hu, Yunpeng
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2329 - 2332
  • [29] A Life Cycle Risk Management Framework for Green Building Project Stakeholders
    Koc, Kerim
    Kunkcu, Handan
    Gurgun, Asli Pelin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (04)
  • [30] Risk assessment model of China’s solar photovoltaic power generation project investment based on life-cycle management
    Zeng, Ming
    Chen, Limin
    Cheng, Huan
    Fan, Qiannan
    Xue, Song
    Energy Education Science and Technology Part A: Energy Science and Research, 2014, 32 (06): : 7093 - 7098