共 50 条
- [41] Universal method of determining bromides in raw materials and products formed in magnesium production Metallurgist, 2009, 53 : 176 - 183
- [43] Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2011, 32 (06): : 1253 - 1258
- [46] An MIP-Based Heuristic Approach to Determine Production Lot Size for Capacitated Single-Stage Production Processes with Stochastic Demand on Parallel Machines 2017 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM), 2017, : 69 - 74
- [48] THE GENERAL MULTI-PRODUCTS DYNAMIC LOT SIZE MODEL WITH INDIVIDUAL INVENTORY COSTS AND JOINT PRODUCTION COSTS ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1985, 9 (1-3): : 15 - 21
- [49] Determining the materials procurement policy based on the economic order/production models with backlogging permitted The International Journal of Advanced Manufacturing Technology, 2006, 30 : 156 - 165
- [50] A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2011, 32 (06): : 1417 - 1423